header Image
MADHYA PRADESH
Implementation Percentage
99.46%

YES
367
N/A
3
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Mandate online filing of single integrated return and applicable payments under all Labour Laws

Approved View File View URL Labour Department has introduced online filing of single integrated return and applicable payments under all Labour Laws Details
2

Introduce a provision for self-certification /third party certification for boilers during use u/s 34(3) of the Boilers Act, 1923, by persons having requisite qualification and experience

Approved View File Department has a provision for third party certification for boilers by authorized qualified engineers Details
3

Introduce a provision for issuing Factory License and all subsequent renewals with validity of 10 years or more

Approved View File State has introduced the relevant provisions for issuing Factory License and all subsequent renewals with validity of 10 years or more Department has amended the Madhya Pradesh Factories Rules 1962 accordingly Details
4

Eliminate the requirement of inspection prior to registration under the Shops and Establishment Act and ensure that the registration is granted within one day from the date of application

Approved View File View URL Labour Department has eliminated the requirement of inspection prior to registration under the Shops and Establishment Act and department has issued an order for ensuring that registration under The Shops and Establishment Act is granted within 24 hrs. Details
5

Publish information about the procedure and comprehensive list of documents on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Registration and Grant of license under The Factories Act, 1948 Details
6

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has mandated fixed timeline for delivery of this service through Public Service Delivery Guarantee Act Details
7

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
8

Ensure that the system allows the user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department web portal allow user to download final digitally signed approval certificate Details
9

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system where third party can easily verify approval certificates in public domain Details
10

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Approval of plan and permission to construct/extend/or take into use any building as a factory under the Factories Act, 1948 Details
11

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has defined clear timelines for this service and mandated the approval of complete application through Public Service Delivery Guarantee Act Details
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
13

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Department has allowed the user to download final digitally signed approval certificate Details
14

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system where third party can easily verify approval certificates in public domain Details
15

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File Department has provided the information about the procedure and comprehensive list of documents on Single Window Portal Details
16

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Clear timelines have been defined for Boiler Registration & renewal and notified under Public Service Guarantee Act Details
17

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Registration under Boiler Act & Renewal is provided as a service through the online single window system , facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. Details
18

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL The system allows the user to download the final approval certificate online. Details
19

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Department portal allows the third party to verify the approval certificates in public domain. Details
20

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File Detailed user manual along with comprehensive list of documents is available on department portal in public domain Details
21

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Clear timelines have been defined for Boiler Manufacturer & renewal and notified under Public Service Guarantee Act Details
22

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Boiler manufacturer and renewal is provided as a service through the online single window system, facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. Department has also mandated that all applications are submitted online through the portal. Details
23

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Department portal allows the user to download the final signed approval certificate Details
24

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Department portal allows the third parties to verify the approval certificates online in the public domain Details
25

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File Department has published the procedures and comprehensive list of required documents at the department portal Details
26

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Clear timelines have been defined for Boiler Erector & renewal and notified under Public Service Guarantee Act Details
27

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Boiler Erector and renewal is provided as a service through the online single window system, facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. Department has also mandated that all applications are submitted online through the portal. Details
28

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL The system allows the user to download the final approval certificate online. Details
29

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Department portal allows the third parties to verify the approval certificates online in the public domain Details
30

Publish information about the procedure and a comprehensive list of documents that on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents is made available on Labour Departments website for contractors under provision of The Contracts Labour (Regulation and Abolition) Act,1970 Details
31

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for contractors under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 in Public Service Delivery Guarantee Act Details
32

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
33

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL User can download final digitally signed approval certificate on labour department portal Details
34

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system where third party can verify approval certificates in public domain Details
35

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Registration and renewal under The Shops and Establishment Act Details
36

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration and Renewal under The Shops and Establishment Act in Public Service Delivery Guarantee Act Details
37

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
38

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented the online system for download of final approved certificate Details
39

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system where third party can easily verify approval certificates in public domain Details
40

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Registration of principal employers establishment under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 Details
41

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Principal Employer under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 in Public Service Delivery Guarantee Act Details
42

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
43

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented an online system for download of final approved certificate Details
44

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented online system to easily verify the approval certificates in the public domain Details
45

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Registration under the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 Details
46

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration under the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 in Public Service Delivery Guarantee Act Details
47

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
48

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented the online system which allows the user to download the final signed approval certificate from the online portal Details
49

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system to easily verify the approval certificates in the public domain Details
50

Publish information on about the procedure and a comprehensive list of documents that on the Department`s web site

Approved View File View URL User manuals which comprises of detailed procedures & comprehensive list of documents made available on Labour Departments website for Registration of establishment under the Inter State Migrant Workmen (RE&CS) Act,1979 Details
51

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration of Establishment under The Inter State Migrant Workmen (RE&CS) Act in Public Service Delivery Guarantee Act Details
52

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
53

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented the online system which allows the user to download the final signed approval certificate from the online portal Details
54

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system where third party can verify approval certificates in public domain Details
55

Establish a specialized division/bench under the High Court to hear commercial disputes

Approved View File A Commercial Division and Commercial Appellate Division have been constituted under the High Court, Jabalpur Details
56

Establish specialized commercial courts (in major towns/cluster of district so as to cover the whole State) to hear and resolve the commercial disputes

Approved View File State has established commercial courts in 50 districts of Madhya Pradesh, via notifications dated 26th June 2016 and 1st April 2017 Details
57

Ensure at least 90% of the vacancies in specialized Commercial courts been filled up

Approved View File 100% vacancies are filled in Commercial courts. Details
61

Merge payment of court fees and process fees into a single transaction/procedure

Approved View File View URL The state via amendment of High court rules, 2008 on 2nd June 2017 has amalgamated process fee with court fee Details
62

Publish model commercial contract templates in public domain in downloadable and editable format along with instructions to use them

Approved View File View URL Model commercial contract templates in editable format along with instructions are uploaded on Madhya Pradesh law and legislative affairs department website. Details
63

Design and implement a system that allows e-filing for commercial disputes in Commercial courts

Approved View File View URL In Madhya Pradesh, e-filing facility is available at High Court and District Court portal for all type of cases and commercial cases respectively Details
64

Design and implement a system that allows issuance of e-summons for commercial disputes in Commercial courts

Approved View File Honourable High Court of Madhya Pradesh and District Courts has implemented a system that allows issuance of e-notices/e-summons/warrants for commercial disputes in Commercial courts Details
65

Design and implement a system that allows publishing of e-cause lists for commercial disputes in Commercial courts

Approved View File View URL State has already implemented a system for publishing e-cause lists for all types of cases (including commercial disputes) on High Court and District / Commercial courts website Details
66

Design and implement a system that allows e-payment of court fees and process fees for Commercial disputes in Commercial courts

Approved View File View URL An online system has been designed and implemented for e-payment of Court fee and Process Fee for all types of cases, Including Commercial Disputes, for all District Courts and High Court through High Court Portal Details
67

Design and implement a system that allows issuance of digitally signed court orders in Commercial courts

Approved View File View URL There is a system in place for issuance of digitally signed court orders in Commercial courts Details
68

Digitize land transaction deeds of last 2 years at all sub-registrar offices and make the same available on an online system

Approved View File View URL Department has Digitized land transaction deeds of last 2 years at all sub-registrar offices and make the same available on department portal Details
69

Digitize land records of last 2 years at all land records offices and publish the updated land records online in public domain

Approved View File View URL Land records of last 2 years are digitized at all land records offices, and the updated land records are published online in public domain Details
70

Digitize land records of last 2 years at local municipality office and publish the updated land records online in public domain

Approved View File View URL Records of more than 5 years are digitized at local municipality office and the necessary information related to Property and its outstanding tax is available online on urban department portal Details
71

Digitize Property tax payment records of last 2 years with a functionality to view balance payments at all local municipality offices and publish the updated records online in public domain

Approved View File View URL The Property tax records have been digitized for more than 2 years and are available in public domain where any user can search records of property tax paid or outstanding on each property within the municipality Details
72

Digitize cadastral maps of all rural areas in the state

Approved View File View URL Cadastral maps of all rural areas in the state are digitized Details
73

Integrate last 2 years data at all sub-registrar offices, all land records offices and all local municipality offices to facilitate property wise mapping of transactions

Approved View File Data of last 2 years has been integrated at all sub-registrar offices, all land records offices and all local municipality offices to facilitate property wise mapping of transactions Details
74

Ensure that statistics of land disputes is maintained in land record offices and also, ensure to publish list of current disputes in public domain

Approved View File View URL Statistics of land disputes is maintained in land record offices and also list of current disputes is published in public domain Details
75

Integrate all sub-registrar offices with PAN and Aadhar data to create a State level database to verify the accuracy of documents

Approved View File View URL Department has Integrated all sub-registrar offices with PAN and Aadhar data to create a State level database to verify the accuracy of documents on the login of internal users Website Details
76

Integrate land record databases with Judicial database (Revenue) to provide complete picture of current land disputes

Approved View File View URL Land record databases are Integrated with Judicial database (Revenue) to provide complete picture of current land disputes. Details
77

Integrate the mutation process with the registration process and allow intimation of mutation as soon as the deed is registered

Approved View File View URL The Revenue department has integrated the mutation process with registration of documents. Mutation is initiated as soon as the deed is registered. Details
78

Publish information about the procedure and a comprehensive list of documents required for property registration on the Department`s web site

Approved View File View URL Department of Registration & Stamp has published information for procedure and a comprehensive list of documents required for property registration, on the department website Department has also made video tutorials for property registration & made the tutorial available for user awareness Details
79

Provide model deed templates for sale, gift, lease, mortgage and rent in downloadable and editable format along with instructions to use them

Approved View File View URL Department Portal provides model deed templates for sale, gift, lease, mortgage and rent in downloadable and editable format along with instructions to use them Details
80

Design and implement a system that allows online application and payment for submission and verification of document and mandate that all applications are submitted online and mandate that all applications are submitted online

Approved View File View URL Department has implemented a system that allows online application and payment for submission and verification of document. Department has also mandated online submission of all applications through gazette notification dated 29 July 2015. Details
81

The online system should have the facility of auto calculation of the applicable fee and stamp duty as per the valuation of the property

Approved View File View URL Department does have an online system in place which provides the facility of auto calculation of the applicable fee and stamp duty as per the valuation of the property Details
82

The online system should have the facility of auto generation of appointment (date and time) on making the required payment online at respective SRO offices

Approved View File View URL The online system has the facility of auto generation of appointment (date and time) on making the required payment online at respective SRO offices Webpage Details
83

The registration of the transaction deed to be provided to related parties on the same day of appointment

Approved View File View URL Department has mandated the registration of the transaction deed to be provided to related parties on the same day of appointment Portal provides registration of the transaction deed to related parties on the same day of appointment Details
84

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Department has a system in place which allows user to download the final signed approval certificate from the online portal Details
85

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for document registration and mutation of land

Approved View File View URL Clear timelines have been mandated through Public Service Guarantee Act for document registration & mutation of land and same has been made available on Department Portal Details
86

Institutionalize a Central Inspection System responsible for undertaking compliance inspections of the departments concerned

Approved View File View URL Department of industries released an order mentioning formation of Central Inspection System which will be responsible for undertaking compliance inspections of Labour Department, Industries (Boilers) Dept., State Pollution Control Board Details
87

Design and develop an online inspection system for scheduling of inspections

Approved View File View URL Online Central Inspection System has been implemented for scheduling of inspections for Labour department, Industries Department (Boiler), State Pollution Control Board. Details
88

Ensure that the selection of establishments for inspection is done using computerized risk assessment and allocation of inspectors is undertaken under the Central Inspection System

Approved View File View URL Online Central Inspection System has been implemented for scheduling of inspections and allocation of inspectors for Labour department, Industries Department (Boiler), State Pollution Control Board. CIS ensures that selection of establishments for inspection is done using computerized risk assessment. Details
89

Differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all the labour laws

Approved View File View URL Labour Department has implemented differentiated compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all the labour laws Details
90

Exempt low risk industries with a history of satisfactory compliance from labour compliance inspections, or allow self-certification in lieu of conducting physical inspections under all the Labour laws

Approved View File View URL Labour department has laid down the risk criteria & inspection procedures for different categories of industries (High, Medium & Low). Low risk industries such as Micro industries, new MSMEs, Startups, etc. are exempted from inspections under various labour laws through notification dated 10/03/2016 Details
91

Mandate synchronized/joint- inspection under all of the following acts: 
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III.  Inspection under The Maternity Benefit Act, 1961
IV.  Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable) 
VI. Inspection under The Labour Welfare Fund Act (as applicable) 
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File View URL Department has mandated joint inspection under all labour laws (as mentioned above) and department has issued the relevant notification for the same Details
92

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber(Orange), and Green under all environment/pollution laws

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has issued a notification to Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber(Orange), and Green Department has published the relevant notification on website to spread the awareness Details
93

Allow third party certifications instead of Departmental inspections under all the labour and environment/pollution laws for medium risk industries

Approved View File Labour department has allowed third party certifications instead of Departmental inspections under all the labour laws for medium risk industries. Madhya Pradesh Pollution Control Board (MP PCB) has allowed following Autorenewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification for Green and Orange category of Industries. Auto renewal of Consent to Establish (under Water Act, 1974 and Air Act, 1981) based on self-certification Details
94

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has exempted the green industries with a history of satisfactory compliance, The Department has issued the relevant notification to ensure the implementation of Exemption for Green Industries Details
100

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Well defined inspection procedure and checklist is provided on department website under Automated Building Approval System (ABPAS) Details
101

Design and implement a computerized system for identifying building/area that needs to be inspected based on risk assessment

Approved View File View URL State of Madhya Pradesh has computerized system for identifying building/area that needs to be inspected based on risk assessment parameters Details
102

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Directorate of Urban Administration and Development, Government of Madhya Pradesh, has mandated the submission of inspection reports within 48 hours Details
103

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL The establishments can view and download submitted inspection reports of past three years, the inspection reports are also available in public domain (at municipal corporations website) Details
104

Design and implement a system for computerized allocation of inspectors

Approved View File System for computerized allocation of inspectors is in place at all municipality corporations offices Details
105

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL The information about the procedure and Inspection checklist of NOC for tree felling is provided on department website Details
106

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented a system for identifying establishments that need to be inspected based on computerized risk assessment. Department has notified three species as low risk for which no inspection is required for obtaining tree felling permission provided maximum two trees are being felled in area upto 300 sq m. The order is attached as Annexure 1. This logic is also built into software application for Tree Cutting permission. Details
107

Mandate online submission of inspection report within 48 hours to the Department

Approved View File In compliance with the above recommendation, online submission of inspection report within 48 hours has been mandated by Directorate, Urban Administration and Development, Government of Madhya Pradesh Details
108

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Establishments can view and download past 2 years inspection report from MP e-Nagar Palika website Details
109

Design and implement a system for computerized allocation of inspectors

Approved View File System for computerized allocation of inspectors is in place Details
110

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File It is mandated that the same inspector will not inspect the same establishment twice consecutively via order dated 11th September 2017 Details
111

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Department has published well defined inspection procedure along with checklist on department portal Details
112

Design and implement a computerized system for identifying building/area that need to be inspected based on risk assessment

Approved View File View URL System is designed and implement for identifying establishments that need to be inspected based on computerized risk assessment. Risk parameters are defined as per order dated 29/06/16. Same logic has been built into the system to identify High, Medium & Low risk industries. Details
113

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Directorate of Urban Administration and Development, Madhya Pradesh has mandated the submission of inspection reports for obtaining completion/Occupancy certificate within 48 hours. Details
114

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Establishments can view and download past 2 years inspection report from MP e-Nagar Palika website Details
115

Design and implement a system for computerized allocation of inspectors

Approved View File System for computerized allocation of inspectors is in place at all municipality corporations offices Details
116

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Equal Remuneration Act, 1976, on departments website Details
117

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
118

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
119

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. after Jan 2015 Details
120

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
121

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
122

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Factories Act, 1948, on departments website. Details
123

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
124

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
125

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has introduced system where user is allowed to view and download submitted inspection reports of past two years i.e. since Jan 2015 Details
126

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
127

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
128

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well defined inspection procedure & a checklist required for Compliance Inspection under The Minimum Wages Act, 1948, on departments website Details
129

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
130

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
131

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. after Jan 2015 Details
132

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
133

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
134

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Shops and Establishments Act on departments website Details
135

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
136

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant orders to ensure the implementation of the timelines Details
137

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has introduced system where user is allowed to view and download submitted inspection reports of past two years i.e. since Jan 2015. Docket No are provided for testing. Details
138

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
139

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
140

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Payment of Bonus Act, 1965, on departments website Details
141

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
142

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
143

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. after Jan 2015 Details
144

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
145

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
146

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Payment of Wages Act, 1936, on departments website Details
147

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
148

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department Department has also issued relevant notification to ensure the implementation of the timelines Details
149

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. after Jan 2015 Details
150

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
151

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
152

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Payment of Gratuity Act, 1972, on departments website Details
153

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
154

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
155

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. since Jan 2015 Details
156

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
157

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
158

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well-defined inspection procedure & a checklist required for Compliance Inspection under The Contract Labour (Regulation and Abolition) Act, 1970, on departments website Details
159

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Department has implemented an online system for computerized risk assessment of establishments/factories that need to be inspected Department has also mandated the online identification of establishments/factories that need to be inspected based on risk parameters, through a notification Details
160

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant orders to ensure the implementation of the timelines Details
161

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. since Jan 2015 Details
162

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Department has implemented an online system for computerized allocation of inspectors Inspectors have an online workspace within the system where they can see their inspection workflows and submit their reports Details
163

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
164

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) portal, for environment consent (XGN portal) has published well defined inspection procedures and checklist on departments portal Details
165

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature into XGN (MP PCB Portal for environment related services) where system identifies establishments that need to be inspected based on computerized risk assessment Details
166

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that inspection reports shall be submitted online within 48 hours Department has also issued the relevant notification and made it available online to spread the awareness amongst investors Details
167

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature into XGN (MP PCB Portal for environment related services) where Establishments are allowed to view & download submitted inspection reports of at least past two years Details
168

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature for computerized allocation of Inspectors in XGN Portal Details
169

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that same inspector will not inspect the same establishment twice consecutively Department has also issued the relevant notification and made it available online to spread the awareness amongst investors Details
170

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) portal for environment consent (XGN portal) has published well defined inspection procedures and checklist on departments portal Details
171

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature into XGN (MP Pollution Control Board web application for environment related services) where system identifies establishments that need to be inspected based on computerized risk assessment Details
172

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that inspection reports shall be submitted online within 48 hours Department has also issued the relevant notification and made it online to spread the awareness among investors Details
173

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature into XGN (MP Pollution Control Board web application for environment related services) where Establishments are allowed to view & download submitted inspection reports of at least past two years Details
174

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has embedded feature for computerized allocation of Inspectors in XGN Portal Details
175

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that same inspector will not inspect the same establishment twice consecutively Department has also issued the relevant notification and made it online to spread the awareness among investors Details
176

Establish a dedicated single window agency as the sole point of contact for setting up a business in State

Approved View File View URL MP TRIFAC (MP Trade and Investment Facilitation Corporation) is acting as the Single Window Secretariat for Investment promotion and facilitation in the state. MP TRIFAC is dedicated Single Window Agency as the sole point of contact for setting up a business in State Details
177

Ensure that the single window agency has been set up through a legislation

Approved View File View URL MP TRIFAC is a single window agency for Madhya Pradesh, which is setup through a legislation- Investment Facilitation ACT 2008 Details
178

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for issuing all approvals being provided by single window agency

Approved View File View URL All the Approvals which are being provided through single window are notified under Public Service Delivery Guarantee Act Details
179

Define clear timelines mandated through legislation or through notification under the Public Service Delivery Guarantee Act for issuing intent letter, granting sanction and disbursal of applicable incentives as per the industrial/sectoral policy in the State

Approved View File View URL Department of Commerce and Industries has notified timeline through Public Service Guarantee Act for issuing intent letter, granting sanction and disbursal of applicable incentives as per the industrial/sectoral policy in the State. Details
180

Design and implement an online single window system with functionality for online application submission, payment and approvals and mandate that all applications are submitted online

Approved View File View URL Industries department has implemented an online single window system with functionality for online application submission, payment and approvals without the need for a physical touch point for document submission and verification. The Department has also mandated that all applications are submitted online. Details
181

Implement a standardized online Common Application Form (CAF) combining applications of all services wherein common information such as applicant`s name, project details, address etc. and common documents are required to be provided only once through single window system

Approved View File View URL Online Common Application Form (CAF) has been implemented combining applications of all services wherein common information such as name of applicant, project details, address etc. and common documents are required to be provided only once through single window system. Details
182

Ensure `Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996` is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate Details
183

Ensure `Registration certificate of Establishment Inter State Migrant Workmen(RE&CS)Act,1979 (License of Contractor Establishment)` is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration certificate of Establishment Inter State Migrant Workmen(RE&CS)Act,1979 (License of Contractor Establishment) is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate Details
184

Ensure `Registration under weights and measures, 1998` is provided as a service through the online single window system facilitating online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration under weights and measures, 1998, is provided as a service through online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. The licenses/Registration provided by Single window portal are- a. License as Manufacturer of Weights & Measures, b. License as Dealer of Weights & Measures, c. License as Repairer of Weights & Measures, d. Registration as Packer/Importer Details
185

Ensure `Consent to establish (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Consent to establish (under Water Act & Air Act) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
186

Ensure `Consent to operate (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Consent to operate (under Water Act & Air Act) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
187

Ensure `Authorization under Hazardous Waste Rules` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Authorization under Hazardous Waste Rules is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. There is a combined application form under Water Act, Air Act & Hazardous waste rules. Details
188

Ensure `Registration under Shops and Establishments Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration under Shops and Establishments Act is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
189

Ensure `Permission for engaging contractor for labour` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Permission for engaging contractor for labour is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificates Details
190

Ensure `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Factories license is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificates Details
191

Ensure `Factory building plan approval` (under the Factories Act, 1948) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Factory building plan approval, under the Factories Act, 1948, is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
192

Ensure `Registration under Boiler Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration under Boiler Act is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
193

Ensure `Change of land use` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File In Madhya Pradesh Change of land use is deemed approved in non- planned area. Investor is required to intimate the relevant authority. There is no need of submitting the application Details
195

Ensure `NOC from Fire Department` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL NOC from Fire Department is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
196

Ensure renewal of `Consent to operate (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Renewal of Consent to operate (under Water Act & Air Act) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s) Details
197

Ensure renewal under `Shops and Establishments Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Renewal under Shops and Establishments Act is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
198

Ensure renewal under `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Renewal under Factories license is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
199

Ensure renewal under `Registration under Boiler Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Renewal of Registration under Boiler Act is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s). Details
200

Ensure `electricity connection` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Electricity connection is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals. Department has following three zones / Dicoms to provide electricity connection a. East zone, b. West zone & c. Central zone Each Discom has a separate online portal Details
201

Ensure `water connection` provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Water connection is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals Details
202

Publish information on the procedure, timelines and a comprehensive list of documents that are required to be submitted for applying for various incentives in the state

Approved View File View URL Department through online single window system has published the information on the procedure, timelines and a comprehensive list of documents that are required to be submitted for applying for various incentives in the state Details
203

Ensure that incentives of all applicable industrial/sectoral policies are applied through a common form without the physical touch points

Approved View File View URL Online system is in place and Incentives of all applicable Industrial/Sectorial policies are applied through a common form without any physical touch points Details
204

Mandate that all queries/clarifications related to investor`s application are sought once and within 7 days of receiving the application

Approved View File View URL The Department has created an independent module for Query clarification on MP INVEST portal (A) For services under Industries Department (B) For other Departmental services This module ensures that after submission of the application query is raised only once and the timeline for raising the query is 7 days from the date of submission of the application, after which that functionality is disabled at the department officers login Details
205

Ensure that the Single Window System sends out SMS/e-mail notification to the applicant as and when the application is submitted and/or query is raised and/or application is approved/rejected

Approved View File State has integrated a mechanism on Single Window System to send out SMS or email notification to the applicant at every stage from application submission to query raised and application approval or rejection Details
206

Ensure that incentives under Industrial/Sectoral Policy are provided as a service through the online single window system (for intent letter, sanction and disbursement) facilitating online application submission and tracking of status and approvals

Approved View File View URL Such a system has been implemented wherein incentives under Industrial/Sectorial Policy are provided as a service through the online single window system (for intent letter, sanction and disbursement) facilitating online application submission and tracking of status and approvals Details
207

Ensure information on land banks for industrial use is publicly available online at one place

Approved View File View URL Department has made the Information of land banks for industrial use and it is available online on Single Window Portal Details
208

Design and implement a GIS system to provide details about the land earmarked for industrial use across the State

Approved View File View URL State is having Geographical Information System (GIS) which allows investors to explore industrial land as per customised needs (Availability, Location, Sector & Size etc.) categorized into three broad category (Developed, Developing & Undeveloped). The system also has the provision of online filing of application for Land allotment through GIS Details
209

Ensure that the GIS system provides details about available infrastructure such as road, water, electrical substation and poles, proximity to National/State highways, Railway lines etc. for all industrial land banks of State

Approved View File View URL The state GIS provides information pertaining to available infrastructure facilities such as road, water, electrical substation and poles, proximity to Bus Stand, Airport, Railway Station, Nearest Town etc. for all Industrial Land Bank of the State. The GIS also incorporates the information related to Social Infrastructure (Education, Healthcare, Hotels, Entertainment Facilities & other Social Facilities etc.) Details
210

Define objective criteria, applicable for all industrial land, for evaluating land allotment application for industrial use

Approved View File View URL In MP all eligible industries are allotted land on First Come First Serve basis. Types of industries categorized as highly polluting hazardous, as specified in Annexure A of Land Allotment Rules 2015, are normally not allotted land in Industrial Areas. The type of industries mentioned in Annexure B are not eligible for allotment of land at all. Quantum of land eligible for allotment is evaluated on the basis of total constructed area, which is 60 %(max), 40 %(min) with FAR of 1.50 (max) Details
211

Publish information about the procedure and a comprehensive list of documents required to be submitted for land allotment on the web site

Approved View File View URL Department has published the information about the step by step procedure & a comprehensive list of documents required to be submitted for land allotment on the state single window portal Details
212

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for land allotment

Approved View File View URL Clear timelines has been defined for Land Allotment service and has been notified under Public Service Delivery Guarantee Act Details
213

Design and implement a land allotment system that allows online application and payment without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Industries department has implemented a land allotment system that allows online application and payment without the need for a physical touch point for document submission and verification. The Department has also mandated through an order that all applications must be submitted online. Details
214

Ensure that the system allows users to download the final signed land allotment certificate from the online portal

Approved View File View URL Industries department has implemented a land allotment system that allows users to download the final signed land allotment certificate (Possession Letter) from the online portal Details
215

Allow third parties to easily verify the land allotment certificates in the public domain

Approved View File View URL State single Window system allows third party to verify the land allotment certificates in the public domain Details
216

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for processing of application for conversion of land/ change in land use (from the date of application) for land outside of industrial parks/IDCs

Approved View File In Madhya Pradesh Conversion of Land/ Change in Land Use is deemed approved in non- planned area. Investor is required to intimate the relevant authority. There is no need of submitting the application. The acknowledgement of the letter is treated as approval. Details
217

Enact a comprehensive uniform building code/building by-law applicable to the entire State

Approved View File View URL Government of Madhya Pradesh through gadget notification F-3-131-2012-32 dated 30.05.2012 has enacted comprehensive uniform building code (Bhumi Vikas Niyam, 2012) applicable to the entire state of Madhya Pradesh Details
218

Ensure that the uniform building code/building by-law include provisions for risk-based classification of buildings

Approved View File View URL State has uniform building code / building by-law which include provisions for risk-based classification of buildings. Additionally department has released an order for risk based classification of buildings Details
219

Ensure that the uniform building code/building by-law includes accreditation programs and clear responsibilities for professionals including architects and engineers engaged in the construction process

Approved View File Government of Madhya Pradesh through Gazette Notification F-3-131-2012-32 dated 30.05.2012 and its subsequent amendments have defined the accreditation procedure ,qualification, competencies , responsibilities and liabilities for the professionals (architects , structure engineers, engineers & surveyors) as part of building by-laws Details
220

Define mandatory qualifications for architects and structural engineers in the uniform building by-law applicable in State

Approved View File Government of Madhya Pradesh through Gazette Notification : F-3-131-2012-32 dated 30.05.2012 and its subsequent amendments have defined the qualification, competencies , responsibilities and liabilities for the professionals (architects , structure engineers, engineers & surveyors), as part of building by-laws Details
221

Develop legally valid master plans/zonal plans/land use plans for all urban areas and make it available online in public domain

Approved View File View URL Legally valid master plans are available on Directorate of Town & Country planning website. Details
222

Establish a dedicated conflict resolution mechanism for land and construction permits

Approved View File Conflict resolution mechanism for land use and construction permits has been described in the The Madhya Pradesh Municipalities Act, 1961 Details
223

Conduct a survey of all industrial areas of State and create a list of plots with trees and publish online a comprehensive information on type of trees

Approved View File Industries Department ensures that the plots/ land which are allotted to the investors have NO Trees, hence Tree NOC is not applicable for industrial area Details
224

Publish online the detailed information on applicable replanting requirements for plots with varying tree populations

Approved View File Industries Department ensures that the plots/ land which are allotted to the investors have NO Trees, hence Tree NOC is not applicable for industrial area. Details
225

Allow authorized architects to issue the completion certificate at all urban areas and IDCs, instead of requiring a separate completion certificate to be issued

Approved View File Authorized architects are allowed to issue the completion certificate at all urban areas and IDCs in Madhya Pradesh. Details
226

Implement a system to allow approval based on third party certification (during construction and/or completion stage, as applicable) of structural design and architectural drawings by authorized structural engineers and architects respectively across all urban areas and IDCs

Approved View File Government of Madhya Pradesh has implemented desired reforms through amendments made in Madhya Pradesh Bhumi Vikas Niyam 2012 (Building By-laws) via Gazette notification F-3-26-2015-XVIII-5 dated 27.11.2015. Details
227

Combine all affidavits & undertakings required to be submitted for obtaining the building plan approval into one affidavit/undertaking

Approved View File View URL Department has reduced the time and procedures in obtaining the approval. A single affidavit is being taken by the department, order has been issued for the same. The Department has added a sample template for the affidavit along with the order from Commissioner UADD Details
228

Publish information about the procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State approvals (prior to plinth and pre - occupancy) on the web site

Approved View File View URL Well defined procedure and comprehensive list of documents is provided on website of Urban department, under Automated Building Plan approval system. All the required documents are uploaded only once at the pre construction stage. No documents are required at post construction stage. Inspection checklist is also provided on the website Details
229

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation to grant construction permits including all required approvals; pre-construction, during construction and post construction

Approved View File Government of Madhya Pradesh has mandated clear timelines through Public Service Delivery Guarantee Act to grant construction permits including all required approvals, pre construction, during construction and post construction. Details
230

Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Sewerage, Electricity, Labour (such as Factory license), Water Department and internal departments responsible for granting construction permits in urban areas and IDCs

Approved View File Department has mandated that a single joint site inspection shall be carried out by all concerned departments for granting construction permits in urban areas Details
231

Design and develop an online single window system for granting construction permits with following functionalities: 
i. A common integrated application for all internal and external agencies required to provide applicable NOCs/Approvals such as Fire Services, Water and Sewerage Department, Discoms, AAI, NMA, Forest, labour, Factory Directorate etc.
ii. Provision for making an online application with integrated payment without the need for a physical touch point for document submission and verification
iii. The system should allow auto scrutiny of building plans from compliance perspective according to the uniform building codes/building by-law using Auto DCR (or similar) software
iv. Ensure that the system issues digitally signed approved building plan within 30 days from the date of application
v. Provision for e-intimation to authorities of plinth level completion
vi. Provision for online issuance of certificate of inspections
vii. Provision for online common completion request form cum Occupancy Certificate Application with online payment
viii. Provision for online issuance of digitally signed occupancy cum completion certificate to the applicant

Approved View File View URL In Madhya Pradesh, The Automated Building Plan Approval System (ABPAS) is an online single window system for granting construction permits with above functionalities. Details
232

Define clear timelines mandated through legislation for sanctioning of building permits in 30 days

Approved View File Department has defined clear timelines for granting building construction permits including all required approval in 30 days and notified the timelines under Public service Delivery Guarantee Act Details
233

Stipulate that construction permits are provided within 45 days: 
i. Building Plan approval is provided within 30 days
ii. Plinth Inspection is done within 7 days of intimation
iii. Final completion/occupancy certificate is provided within 8 days ( 7 days for inspection + 1day for issuing the certificate)

Approved View File Government of Madhya Pradesh has stipulated that construction permits are provided within 45 days, with the give split I. Building Plan approval is provided within 30 days II. Plinth Inspection is done within 7 days of intimation III. Final completion/occupancy certificate is provided within 8 days Details
234

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Third parties can easily verify the approval certificates in the public domain. Verification/ search can be done on the basis of various parameters like File number, owner name, consultant, Zone, Ward, Colony, Plot Details
235

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL Department has published the procedure and a comprehensive list of documents required on the web site Details
236

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has defined clear timelines for NOC for tree felling from Tree Authority and same has been notified under Public Service Guarantee Act Refer PSG for Tree Cutting , Tree Transit and Trade licence, point no 5.10 Details
237

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Department has implemented a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification. Department has also mandated that all applications for tree felling should be submitted online only. Details
238

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Final signed NOC for tree felling can be downloaded from MP e-nagarpalika portal Details
239

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Department portal allows third party to verify the NOC for tree felling Details
240

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL Department has published the information about the procedure and a comprehensive list of required documents on the department portal Details
241

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has defined clear timelines of Tree Transit permission and same has been notified under Public Service Guarantee Act Details
242

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Department has implemented a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification. Department has also mandated that all applications for tree transit should be submitted online only Details
243

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL System allows user to download the final signed approval certificate from the online portal. User can download tree transit pass from on e-nagarpaliaka portal Details
244

Allow third parties to easily verify