header Image
BIHAR
Implementation Percentage
26.08%

YES
97
NO
275
N/A
0
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
5

Publish information about the procedure and comprehensive list of documents on the Department`s web site

Approved View File View URL Details
7

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Details
8

Ensure that the system allows the user to download the final signed approval certificate from the online portal

Approved View File View URL Details
10

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Details
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
13

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
15

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Details
18

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
30

Publish information about the procedure and a comprehensive list of documents that on the Department`s web site

Approved View File View URL Details
35

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Details
37

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Renewal of licences/certificates is not required under Bihar Shops and Establishment Act Details
38

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
40

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Details
43

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
45

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Details
91

Mandate synchronized/joint- inspection under all of the following acts: 
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III.  Inspection under The Maternity Benefit Act, 1961
IV.  Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable) 
VI. Inspection under The Labour Welfare Fund Act (as applicable) 
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File View URL Details
92

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber(Orange), and Green under all environment/pollution laws

Approved View File Details
94

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View File Details
102

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The urban Development & Housing Dpartment, GoB has issued a notifiation to this effect. Please refer to the Notification No. 2. (vi) in the attached copy. Details
107

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
110

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File Details
113

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Urban Development & housing Department, GoB has issued a notification to this effect. Please refer to the Notification no. 2. (vi) in the attached copy. Details
118

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
121

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
124

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
127

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
130

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Through letter dated: 29/8/17 (letter No: 4464) it is notified that, The Inspections will be conducted by a joint inspection team only, and the inspection reports have to be submitted online within 48 hours of inspection. The Joint Inspection team will be lead and coordinated by the Labour Superintendent of the area and the concern factory Inspector & the DLC will be part of this joint Inspection team. The team will conduct inspections under all applicable labour laws in one single visit only. Details
133

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
136

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
139

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
142

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
145

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
148

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
151

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
154

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
157

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
160

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
163

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details
164

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File Details
166

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
170

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File Details
172

Mandate online submission of inspection report within 48 hours to the Department

Approved View File This action point was compiled last year only and documentary evidence in support of its compliance was accepted and approved by DIPP. Moreover, Pollution Control Board undertakes inspections of establishments only under the various Acts provisioned by Central Ministry. Also, water and air samples implies that inspection is under The Air Act and The Water Act. Requesting to please consider the documentary evidence uploaded. Details
175

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File Details
177

Ensure that the single window agency has been set up through a legislation

Approved View File Details
178

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for issuing all approvals being provided by single window agency

Approved View File View URL Constitution of the Single Window Agency in Bihar has been done as per the Bihar Industrial Investment Promotion Act 2016. As per section 6(4) of the Act, timelines for providing various clearances and services by the SWA shall be as per the respective Governing Acts of the clearances. The list of clearances and their respective Governing Acts etc. has been notified vide Notification No. 1525, dated 18.10.17. Accordingly the list of clearances and timeline has been announced. Details
179

Define clear timelines mandated through legislation or through notification under the Public Service Delivery Guarantee Act for issuing intent letter, granting sanction and disbursal of applicable incentives as per the industrial/sectoral policy in the State

Approved View File View URL The timeline for issuing intent letter, granting sanction and disbursal of applicable incentives as per the industrial/sectoral policy in the State is governed by the Bihar Industrial Investment Promotion Act, 2016 vide Notification No.1525,dated 18.10.17. The Act guarantees the permission within 30 days or assures of deemed approval under its section 6(4) in case decision is not given within 30 days. Details
180

Design and implement an online single window system with functionality for online application submission, payment and approvals and mandate that all applications are submitted online

Approved View File View URL Details
181

Implement a standardized online Common Application Form (CAF) combining applications of all services wherein common information such as applicant`s name, project details, address etc. and common documents are required to be provided only once through single window system

Approved View File View URL Details
182

Ensure `Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996` is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
183

Ensure `Registration certificate of Establishment Inter State Migrant Workmen(RE&CS)Act,1979 (License of Contractor Establishment)` is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
184

Ensure `Registration under weights and measures, 1998` is provided as a service through the online single window system facilitating online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
185

Ensure `Consent to establish (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
186

Ensure `Consent to operate (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
187

Ensure `Authorization under Hazardous Waste Rules` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
188

Ensure `Registration under Shops and Establishments Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
189

Ensure `Permission for engaging contractor for labour` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
190

Ensure `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
191

Ensure `Factory building plan approval` (under the Factories Act, 1948) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
192

Ensure `Registration under Boiler Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
193

Ensure `Change of land use` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
195

Ensure `NOC from Fire Department` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
196

Ensure renewal of `Consent to operate (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
197

Ensure renewal under `Shops and Establishments Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Details
198

Ensure renewal under `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
199

Ensure renewal under `Registration under Boiler Act` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
200

Ensure `electricity connection` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Details
201

Ensure `water connection` provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Details
202

Publish information on the procedure, timelines and a comprehensive list of documents that are required to be submitted for applying for various incentives in the state

Approved View File View URL Details
203

Ensure that incentives of all applicable industrial/sectoral policies are applied through a common form without the physical touch points

Approved View File View URL Details
204

Mandate that all queries/clarifications related to investor`s application are sought once and within 7 days of receiving the application

Approved View File Details
205

Ensure that the Single Window System sends out SMS/e-mail notification to the applicant as and when the application is submitted and/or query is raised and/or application is approved/rejected

Approved View File Details
206

Ensure that incentives under Industrial/Sectoral Policy are provided as a service through the online single window system (for intent letter, sanction and disbursement) facilitating online application submission and tracking of status and approvals

Approved View File View URL Details
217

Enact a comprehensive uniform building code/building by-law applicable to the entire State

Approved View File View URL The Bihar State had enacted a comprehensive Bihar Building Bye-laws in 2014 which is applicable to all ULBs and IDCs. Excerpts of teh Bye-laws are attached. Details
230

Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Sewerage, Electricity, Labour (such as Factory license), Water Department and internal departments responsible for granting construction permits in urban areas and IDCs

Approved View File View URL The Urban Development and Housing Department, GoB has issued a notification to this effect. Please refer to Notification No. 2. iii. Details
237

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Details
252

Allow for auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification and ensure that majority of establishments avail this provision

Approved View File Details
257

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
258

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
259

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Details
262

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
263

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
264

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Details
267

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
268

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
269

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Details
272

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
273

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File Details
274

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Details
277

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
278

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File Details
279

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Details
283

Ensure that total outage cap is fixed by regulator for a quarter/year and the Discoms compensates customers for outages that go over the fixed cap

Approved View File Details
284

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File Details
285

Reduce the number of documents required for obtaining the electricity connection to only two i.e. proof of ownership/occupancy and authorization document (in case of firm/company)

Approved View File Details
286

Allow third party inspection of internal installations and ensure that majority of establishments avail this provision

Approved View File View URL The State has a licensing board to issue licenses for electrical contractors, supervisors & wiremen. Their qualification parameters & selection process are well defined. The contractors etc. are engaged by the promoter at the construction phase of the premises. Based on their certification, DisComms provide the electricity supply. The format for certificate is also defined & published. Only in case of HT connections where transformers are installed, NOC of electrical inspectorate is required. Details
291

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application for granting `Right of Way` (RoW) permission

Approved View File As per the Bihar Industrial Investment Promotion Act, 2016Act/ Notification No. 1525 the time line for the delivery of Road Cutting/ Right of Way (RoW) permission for Road Construction Department for electricity connection service / is to be done within 30days. The service notified under Bihar Industrial Investment Promotion Act, 2016 vide Notification No.1525 Dated 18.10.2017.which guarantees the delivery of service within 30days or assures of deemed approval under section 6(4). Details
411

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Details

Back
Terms & Conditions | Privacy Policy | Copyright Policy | Hyperlinking Policy | Disclaimer | Site Map | Help
CONNECT WITH US
Designed, Developed and Hosted by National Informatics Centre. Contents Providedand Maintained by Department of Industrial Policy and Promotion