header Image
BIHAR
Implementation Percentage
87.47%

YES
314
NO
45
N/A
13
Reform Details
Reform NoReform Area Current Status
2

Introduce a provision for self-certification /third party certification for boilers during use u/s 34(3) of the Boilers Act, 1923, by persons having requisite qualification and experience

No
7

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
17

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
32

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
37

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
42

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
47

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
52

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
55

Establish a specialized division/bench under the High Court to hear commercial disputes

No
61

Merge payment of court fees and process fees into a single transaction/procedure

No
63

Design and implement a system that allows e-filing for commercial disputes in Commercial courts

No
64

Design and implement a system that allows issuance of e-summons for commercial disputes in Commercial courts

No
66

Design and implement a system that allows e-payment of court fees and process fees for Commercial disputes in Commercial courts

No
67

Design and implement a system that allows issuance of digitally signed court orders in Commercial courts

No
69

Digitize land records of last 2 years at all land records offices and publish the updated land records online in public domain

No
73

Integrate last 2 years data at all sub-registrar offices, all land records offices and all local municipality offices to facilitate property wise mapping of transactions

No
74

Ensure that statistics of land disputes is maintained in land record offices and also, ensure to publish list of current disputes in public domain

No
75

Integrate all sub-registrar offices with PAN and Aadhar data to create a State level database to verify the accuracy of documents

No
76

Integrate land record databases with Judicial database (Revenue) to provide complete picture of current land disputes

No
77

Integrate the mutation process with the registration process and allow intimation of mutation as soon as the deed is registered

No
78

Publish information about the procedure and a comprehensive list of documents required for property registration on the Department`s web site

No
106

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

No
108

Allow establishments to view and download submitted inspection reports of at least past two years

No
112

Design and implement a computerized system for identifying building/area that need to be inspected based on risk assessment

No
114

Allow establishments to view and download submitted inspection reports of at least past two years

No
119

Allow establishments to view and download submitted inspection reports of at least past two years

No
125

Allow establishments to view and download submitted inspection reports of at least past two years

No
131

Allow establishments to view and download submitted inspection reports of at least past two years

No
137

Allow establishments to view and download submitted inspection reports of at least past two years

No
143

Allow establishments to view and download submitted inspection reports of at least past two years

No
149

Allow establishments to view and download submitted inspection reports of at least past two years

No
155

Allow establishments to view and download submitted inspection reports of at least past two years

No
161

Allow establishments to view and download submitted inspection reports of at least past two years

No
169

Mandate that the same inspector will not inspect the same establishment twice consecutively

No
221

Develop legally valid master plans/zonal plans/land use plans for all urban areas and make it available online in public domain

No
231

Design and develop an online single window system for granting construction permits with following functionalities: 
i. A common integrated application for all internal and external agencies required to provide applicable NOCs/Approvals such as Fire Services, Water and Sewerage Department, Discoms, AAI, NMA, Forest, labour, Factory Directorate etc.
ii. Provision for making an online application with integrated payment without the need for a physical touch point for document submission and verification
iii. The system should allow auto scrutiny of building plans from compliance perspective according to the uniform building codes/building by-law using Auto DCR (or similar) software
iv. Ensure that the system issues digitally signed approved building plan within 30 days from the date of application
v. Provision for e-intimation to authorities of plinth level completion
vi. Provision for online issuance of certificate of inspections
vii. Provision for online common completion request form cum Occupancy Certificate Application with online payment
viii. Provision for online issuance of digitally signed occupancy cum completion certificate to the applicant

No
232

Define clear timelines mandated through legislation for sanctioning of building permits in 30 days

No
233

Stipulate that construction permits are provided within 45 days: 
i. Building Plan approval is provided within 30 days
ii. Plinth Inspection is done within 7 days of intimation
iii. Final completion/occupancy certificate is provided within 8 days ( 7 days for inspection + 1day for issuing the certificate)

No
237

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
242

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

No
287

Ensure that users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas of State and ensure these charges (demand note) is generated through the online system

No
289

Stipulate that charged electrical connections (up to 150 KVA) is provided within Seven days (where no `Right of Way` (RoW) is required) and in Fifteen days where RoW is required from concerned agencies

No
303

Mandate that VAT refund payment should directly be paid into organization`s account within 60 days

No
424

Allow third party to view and verify the records of past payments by entering connection number

No

Back