header Image
TAMIL NADU
Implementation Percentage
62.80%

YES
211
NO
125
N/A
4
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Develop and make publicly available a comprehensive checklist of all required pre-establishment No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for setting up of a business

Approved View File View URL Details
2

Develop and make publicly available a comprehensive checklist of all required pre-operation No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for starting business operations

Approved View File View URL Details
3

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to establishing her/his business/industrial unit

Approved View URL Details
4

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to starting operations of her/his business/industrial unit

Approved View URL Details
5

Establish a centralized help line number to facilitate queries regarding the application and approval process

Approved View URL Details
8

Mandate that the final professional tax registration certification (where applicable) will be issued within at most one (1) working day from the date of submission of application form

Approved View URL https://erp.chennaicorporation.gov.in/e-portal/login.do user name: suresh Password: suresh@123. Details
14

Establish a dedicated physical body/ bureau that functions as the sole point of contact for the purpose of setting up a business

Approved View File Details
15

Ensure that the single window body/ bureau has been set up through a legislation/State notification

Approved View File Details
20

Ensure that the single window provides clear timelines for addressing investor grievances

Approved View File Has prescribed a time limit of 30 days for issue of all clearances from the date of application to Guidance Bureau. Details
21

Implement an online Common Application Form (CAF) for all required clearances/approvals in the single window

Approved View URL Details
27

Ensure ‘Registration under Shops and Establishments Act’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Details
31

Ensure ‘Registration under Boiler Act’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View URL Details
36

Ensure renewal under ‘Shops and Establishments Act’ is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Details
39

Ensure electricity connection is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals

Approved View URL Details
41

Design and implement an online system for filing of EM Part I and Part II under The Micro, Small and Medium Enterprises Development Act, 2006

Approved View URL Details
42

Ensure information on land banks for industrial use are made publicly available online

Approved View File View URL Details
43

Earmark industrial land parcels with specific criteria (e.g. type of industries, pollution levels etc.) for industries that can be setup on such land

Approved View URL Details
47

Define clear timelines defined for processing of application for land allotment (from the date of application)

Approved View URL Details
48

Define clear timelines for processing of application for conversion of land/ change in land use (from the date of application) for land outside of industrial parks/IDC areas.

Approved View URL Details
49

Make available a model sale deed format for property registration on the department’s website

Approved View URL Details
57

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Details
59

Design and implement a system that allows online application and payment without the need for a physical touch point for document submission and verification

Approved View File View URL Details
61

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Details
75

Establish a dedicated conflict resolution mechanism for land and construction permits.

Approved View File View URL Sections 79, 95, 113 of TNT&CP Act 1971. Details
76

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL http://www.tn.gov.in/dtp/property_tax.htm https://www.ccmc.gov.in/ccmc/index.php/administration/town-planning/35-toplink/toplink/164-checklist-for-building-application http://www.tn.gov.in/tcp/checklist.html http://www.cmdachennai.gov.in/menu-apu.html Under this link the following submenus need to be accessed Planning Permission Applications Accepted Through Local Bodies Application Directly Admitted By CMDA Download Forms Enclosures for the PP Applications Details
77

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL http://www.tn.gov.in/dtp/citizen_dtp.pdf Refer SL.NO 10,Table in page no 3 http://www.maduraicorporation.co.in/citizencharter.html Refer middle of the Page Details
81

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
82

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
83

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
84

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
85

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
87

Define clear timelines mandated through legislation for approval of application

Approved View File Details
88

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Status can be tracked with Application No with below URL http://110.172.171.189/eda/VerifyCerti.xhtml Details
89

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
90

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Step 1: Open the above link and choose the service which you want to verify Step 2: Enter the Application Number or Licence Number which you want to verify Step 3: If Licence Number or Certificate number is exist in our system, it will be downloaded Details
91

Enact a list of green industries applicable for the State.

Approved View File View URL Industries have been categorized as Red, Orange and Green category by Central Pollution Control Board Details
92

Exempt select green industries from pollution control board clearances

Approved View URL Click on control key 34 As per the directions of CPCB, White category industries are exempted from obtaining consent of SPCB. Details
93

Allow for auto-renewal of Consent to Establish (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View URL Click on control key 20 and 21 Details
94

Allow for auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View URL Click on control key 20 and 21 Details
95

Issue Consent to Operate licences that are valid for a minimum period of 5 years or more

Approved View URL Click on control key 36 (Sl.No.31) Page No.3 of the BP no. 5 Details
96

Issue Consent to Establish licences that are valid for a minimum period of 5 years or more

Approved View URL Click on control key 36 (Sl.No.31) Page No.2 of the BP no. 5 Details
97

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Click S.No. 1, 5, 10, 12 Details
98

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Click S.No. 9 Details
99

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL Click S.No.12 Details
100

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The consent order can be downloaded from the Online Consent Management and Monitoring System (OCMMS). Details
101

Allow third parties to easily verify approval certificates in the public domain

Approved View URL The consent orders can be viewed by the public from the Online Consent Management and Monitoring System (OCMMS). Details
102

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Click S.No. 1, 5, 10, 12 Details
103

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Click S.No. 9 Details
104

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL Click S.No.12 Details
105

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The consent order can be downloaded from the Online Consent Management and Monitoring System (OCMMS). Details
106

Allow third parties to easily verify approval certificates in the public domain

Approved View URL The consent orders can be viewed by the public from the Online Consent Management and Monitoring System (OCMMS). Details
107

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Click Control key 25, 31 Details
108

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Click Control key 26 Details
109

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL Click on control key 38 (Sl.No.37) Page No. 1-22 indicates details on how to file online application for HW authorisation Page No. 23 shows documents to be attached along with the application for HW authorisation Page No. 24 depicts the submission of application for HW authorisation filed by the industry Page No. 25 shows the viewing and downloading of approved authorization order in industry login Details
110

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL Click on control key 38 (Sl.No.37) Page No. 25 shows the viewing and downloading of approved authorization order in industry login Details
111

Allow third parties to easily verify approval certificates in the public domain

Approved View URL The copies of the Authorization orders are displayed in TNPCB website. Details
112

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Click S.No. 1, 5, 10, 12 Details
113

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Click S.No. 9 Details
114

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL Click S.No.12 Details
115

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The consent order can be downloaded from the Online Consent Management and Monitoring System (OCMMS). Details
116

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Details
117

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Click S.No. 1, 5, 10, 12 Details
118

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Click S.No. 9 Details
119

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL Click S.No.12 Details
120

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The consent order can be downloaded from the Online Consent Management and Monitoring System Details
121

Allow third parties to easily verify approval certificates in the public domain

Approved View URL The consent orders can be viewed by the public from the Online Consent Management and Monitoring System Details
125

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Information on the procedure and the list of documents required for Registration of factory and licensing have been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/qg-eZqV0Woo Details
126

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Details
127

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for factory registration and licensing has been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/7eHSBnM0G4g Details
128

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Factory licence is issued through online portal with the digital signature of the official and uploaded to the user. The user can download the licence as viewed in the video through the URL. https://youtu.be/3btdsJ413qk Details
129

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Factory licence particulars has been provided in the portal ) and this can be viewed as a video through the URL. https://youtu.be/6sD2tAZMZ-k Details
130

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Information on the procedure and the list of documents required for factory plan approval have been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/52X748dt-D8 Details
131

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Details
132

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for factory plan approval has been provided in the portal and this can be viewed as a video through the URL Details
133

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Factory plan approval is issued through online portal with the digital signature of the official and uploaded to the user. The user can download it as viewed in the video through the URL. Details
134

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Factory plan approval has been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/lbbwJHY2D0A Details
135

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Details
137

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
138

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
139

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Enter Boilers Maker no 1234HJ Then click Search Then click Download Certificate Details
140

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL http://www.labour.tn.gov.in/Labour Details
141

Define clear timelines mandated through legislation for approval of complete application

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
142

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for Contractor licensing under Contract Labour Act has been provided in the portal and this can be viewed as a video through the URL Details
143

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Contractor Licence is issued through online portal with the digital signature of the official and uploaded to the user. The user can download the licence as viewed in the video through the URL. Details
144

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Contract Labour licence particulars has been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/CgWEqdPifzg Details
145

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
146

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
147

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
148

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
149

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
150

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
151

Define clear timelines mandated through legislation for approval of complete application

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
152

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for Registration of establishment under Contract Labour Act has been provided in the portal and this can be viewed as a video through the URL. Details
153

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Registration Certificate under Contract Labour Act is issued through online portal with the digital signature of the official and uploaded to the user. The user can download the Registration Certificate as viewed in the video through the URL. Details
154

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Registration certificate on Contract Labour Act particulars has been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/JkO7C3X1Iic Details
155

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL All the relevant information is available in the static content of the Online Portal. Details
156

Define clear timelines mandated through legislation for approval of complete application

Approved View URL All the relevant information is available in the static content of the Online Portal. Details
157

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for Registration of establishment under Building and other Construction Workers (Regulation of Employment and Conditions of Service) Act has been provided in the portal and this can be viewed as a video through the URL. Details
158

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Registration Certificate under Building and other Construction Workers (Regulation of Employment and Conditions of Service) Act is issued through online portal with the digital signature of the official and uploaded to the user. The user can download the Registration Certificate as viewed as a video in the URL. Details
159

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Registration certificate on Building and other Construction Workers (Regulation of Employment and Conditions of Service) Act particulars has been provided in the portal and this can be viewed as a video through the URL. Details
160

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL All the relevant information is available in the static content of the Online Portal. Details
161

Define clear timelines mandated through legislation for approval of complete application

Approved View URL All the relevant information is available in the static content of the Online Portal. Details
162

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for Renewal of factory license has been provided in the portal and this can be viewed as a video through the URL. Details
163

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Factory licence is renewed and issued through online portal with the digital signature of the official and uploaded to the user. The user can download the licence as viewed in the video through the URL. Details
164

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Factory licence particulars has been provided in the portal and this can be viewed as a video through the URL. Details
165

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL Details
166

Define clear timelines mandated through legislation for approval of complete application

Approved View URL Details
167

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
168

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
169

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Enter Boilers Maker no 1234HJ Then click search Then Click Download Certificate Details
170

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL kindly choose Contract Labour Act License Renewal under the heading List of Services. The screen shot of the web page has been attached File Name : ease of doing business Q.No 170 screen shot Details
171

Define clear timelines mandated through legislation for approval of complete application

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
172

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View URL The online service on application for Renewal of Contractor license under Contract Labour Act has been provided in the portal and this can be viewed as a video through the URL. Details
173

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View URL The Contractor Licence is renewed and issued through online portal with the digital signature of the official and uploaded to the user. The user can download the licence as viewed in the video through the URL. Details
174

Allow third parties to easily verify approval certificates in the public domain

Approved View URL Third party verification on the Contract Labour licence particulars has been provided in the portal and this can be viewed as a video through the URL. https://youtu.be/GHz_M0Z78as Details
175

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
176

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
177

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
178

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
182

Enact measures to ensure that the utility compensates customers for outages that go over a certain cap, or that a fine is imposed by the regulator if the outage cap is exceeded

Approved View File Details
183

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File View URL Details
185

Implement an online application for obtaining electricity connection

Approved View URL Details
186

Ensure that users are provided a fixed cost estimate based on the load required for obtaining electricity connection in industrial area

 

Approved View URL Click Schedule of Tariff ,then Click Miscellaneous charges http://www.tnerc.tn.nic.in/ Details
190

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View URL http://www.tn.gov.in/dtp/water.htm http://chennaimetrowater.in/online_metro/ https://tnurbanepay.tn.gov.in/CreateServiceRequest.aspx# Details
191

Define clear timelines mandated through legislation for approval of complete application

Approved View URL http://www.chennaimetrowater.com/public/charter.htm http://www.tn.gov.in/dtp/citizen_dtp.pdf Details
193

Design and implement a system for Value Added Tax (VAT) to be filed online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
194

Design and implement a system for Central Sales Tax (CST) to be filed online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
196

Design and implement a system for Luxury Tax to be filed online

Approved View File Details
197

Design and implement a system for Entry Tax to be filed online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
198

Design and implement a system for Entertainment Tax to be filed online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
199

Design and implement a system for Value Added Tax (VAT) to be paid online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
200

Design and implement a system for Central Sales Tax (CST) to be paid online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
202

Design and implement a system for Luxury Tax to be paid online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
203

Design and implement a system for Entry Tax to be paid online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
204

Design and implement a system for Entertainment Tax to be paid online

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
205

Ensure that users are provided assistance for e-filing at service centers

Approved View File Details
206

Establish a helpline providing basic services assisting users in preparing and filing returns

Approved View URL Helpline provided to assesses through Toll free No.1800 103 6751. Details
208

Implement a system for risk based audit related to tax compliance

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
209

Introduce a system for advance tax ruling for State level taxes on the lines of Income Tax Act

Approved View File Details
212

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
214

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
215

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
216

Allow third parties to easily verify approval certificates in the public domain

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
217

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
218

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
219

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
220

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
221

Allow third parties to easily verify approval certificates in the public domain

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
223

Define clear timelines mandated through legislation for approval of complete application

Approved View URL https://www.ccmc.gov.in/ccmc/images/stories/professionaltax/Professiontax_Amendment.pdf http://www.chennaicorporation.gov.in/about-chennai-corporation/citizen%20charter_rev.pdf Details
225

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
227

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
228

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
231

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
232

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
233

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
234

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
235

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
236

Allow third parties to easily verify approval certificates in the public domain

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
237

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
239

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
240

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
241

Allow third parties to easily verify approval certificates in the public domain

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
242

Differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all labour laws

Approved View URL The scheme of inspection is based on risk profile and the factories carrying on with dangerous operation (as per Section 87 of Factories Act), hazardous process (as per Section 2 (cb) of Factories Act) and match and fireworks factories are inspected for the compliance of general and specific provisions prescribed under the Act and Rules. During an inspection the compliances under all the labour laws are verified concurrently. https://youtu.be/wOzT2dz7S0Q Details
244

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber, and Green under all environment/pollution laws

Approved View URL Click Control key 30 Details
245

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View URL Click Control key 21 and view the attachment (Form A) Details
246

Allow for third party certifications instead of Departmental inspections under all labour and environment/pollution laws for medium risk industries

Approved View URL Click Control key 20, 21 Details
247

Allow for synchronized/joint- inspection under all of the following acts
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III. Inspection under The Maternity Benefit Act, 1961
IV. Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable)
VI. Inspection under The Labour Welfare Fund Act (as applicable)
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View URL https://dish.tn.gov.in/inspection.html#circulars http://www.labour.tn.gov.in/Labour/ Details
248

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL Details
249

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File If any dummy user is allowed in the portal, it may be used for entering values in turnover and tax paid columns which may affect various reports which are being taken based on the entries. Hence, it is not provided even to the departmental users Details
252

Design and implement a system for computerized allocation of inspectors

Approved View File Details
258

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL Details
259

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Details
260

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Details
263

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Details
268

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
270

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
271

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
273

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL Inspectors are appointed for the regulation of the act and rules within certain local limits. As per the attached circular the same inspector is not permitted to inspect the same factory under different Acts at different times. Instead the compliances under all the labour laws are verified concurrently in a single inspection. However, within the jurisdiction, the same inspector may have to inspect the same factory in case of complaints, accident etc. Details
274

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL All the relevant information is available in the Online Portal. Details
276

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL It is available in the portal. Details
277

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
280

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
282

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
283

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
286

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL Details
288

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL It is available in the Labour Dept. website. Details
289

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File Details
290

Design and implement a system for computerized allocation of inspectors

Approved View File Details
292

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL http://www.labour.tn.gov.in/Labour/ Details
294

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
295

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
298

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
300

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
301

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
304

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
306

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
307

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
310

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL http://www.labour.tn.gov.in/Labour/ Details
312

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Details
313

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL During an inspection the compliances under all the labour laws are verified concurrently and the inspection report is uploaded to the user account with the digital signature of the official. The user can download the inspection report containing the contraventions under various labour laws. This may be viewed as a video through the URL. Details
315

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL As per Factories Act and other labour acts, inspectors are appointed for the regulation of the act and rules within certain local limits. As per the attached circular the same inspector is not permitted to inspect the same factory under different Acts at different times. Instead the compliances under all the labour laws are verified concurrently in a single inspection. However, within the jurisdiction, the same inspector may have to inspect the same factory in case of complaints, accident etc. Details
316

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL Click Control key 17 Details
319

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Details
321

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL Click on control key 42 (Sl.No.39) In OCMMS the DEE has the flexibility of requesting any Engineer in his District to carryout inspection. In the note, it is indicated that the Inspection and sample collections can be assigned/altered by the concerned District Officer as and when required based on the workload/ geographical area and any other circumstances with a view to dispose/process the applications, RCO etc. The jurisdictional officer will only assign the application for inspection. Details
322

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL Click Control key 17 Details
324

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Click Control key 17 Details
325

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View URL Click on control key 02 (Sl.No.36) Page No. 37 Details
327

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Click on control key 42 (Sl.No.39) Details
329

Establish specialized courts at the district court level to resolve commercial disputes

Approved View File Details
335

Publish model contract templates and guidelines on department’s website that may be used for commercial contracts

Approved View File Details
338

Design and implement a system to allow for publishing e-cause lists for commercial disputes in District courts/Commercial courts

Approved View URL e-cause lists is being published and is made available in the website Details

Back
Terms & Conditions | Privacy Policy | Copyright Policy | Hyperlinking Policy | Disclaimer | Site Map | Help
CONNECT WITH US
Designed, Developed and Hosted by National Informatics Centre. Contents Providedand Maintained by Department of Industrial Policy and Promotion