header Image
BIHAR
Implementation Percentage
75.82%

YES
254
NO
81
N/A
5
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Develop and make publicly available a comprehensive checklist of all required pre-establishment No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for setting up of a business

Approved View File The attached document contains a comprehensive list of clearances required at pre-establishment and pre-operation stage. Details
2

Develop and make publicly available a comprehensive checklist of all required pre-operation No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for starting business operations

Approved View File The attached document contains comprehensive list of NOCs, Clearances etc. for pre-establishment and pre-operation phase. Details
3

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to establishing her/his business/industrial unit

Approved View URL Details
4

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to starting operations of her/his business/industrial unit

Approved View URL Details
5

Establish a centralized help line number to facilitate queries regarding the application and approval process

Approved View File View URL The centralized helpline number has been made operational. Details
8

Mandate that the final professional tax registration certification (where applicable) will be issued within at most one (1) working day from the date of submission of application form

Approved View File View URL Details
9

Enact a legislation (e.g. Right to Services Act) to mandate time-bound delivery of services to Industries/ Businesses

Approved View File View URL Details
10

Ensure that the time-bound service delivery legislation defines punitive provisions that deter officials from not complying with the defined timelines for services being provided to Industries/ Businesses

Approved View File Refer to Rule 8 highlighted in the attached document. Details
11

Ensure that the time-bound service delivery legislation defines clear procedures for applicants to submit grievances relating to non-compliance with the defined timelines

Approved View File Details
12

Mandate and make arrangements to publish draft business regulation online and invite public comments/ feedback on the same prior to enactment

Approved View File Details
13

Mandate and make arrangements to publish the comments/feedback received on the draft business regulation and how they were addressed in the final regulation

Approved View File Details
19

Ensure that the single window provides clear timelines for issuing all approvals

Approved View File Details
41

Design and implement an online system for filing of EM Part I and Part II under The Micro, Small and Medium Enterprises Development Act, 2006

Approved View File Details
42

Ensure information on land banks for industrial use are made publicly available online

Approved View File View URL Details
43

Earmark industrial land parcels with specific criteria (e.g. type of industries, pollution levels etc.) for industries that can be setup on such land

Approved View File View URL The Bihar Industrial Area Developent Authority has clearly notified the criteria for earmarking the parcel of land for industrial uses which is based on the type of the industries, corresponding pollution level associated with them (basis green, orange and red category of pollution), and distance from human habitation, residential areas, highways etc. Details
46

Define objective criteria for evaluating an application for land allotment

Approved View File View URL Details
47

Define clear timelines defined for processing of application for land allotment (from the date of application)

Approved View File Details
48

Define clear timelines for processing of application for conversion of land/ change in land use (from the date of application) for land outside of industrial parks/IDC areas.

Approved View File Details
49

Make available a model sale deed format for property registration on the department’s website

Approved View URL The model sale deed is available on the above mentioned web link. Details
50

Ensure that users can collect eStamps at the time of property registration at the sub-registrar’s office (i.e. no need of going to the bank to collect the challan/e-stamp)

Approved View File View URL It may be noted that use of stamp paper has been made optional and an applicant register the documents without a stamp paper and he can make the applicable stamp duty payment online. Please refer to Step 9 of the attached file where under payment options, if the user selects - Are you using Stamp Paper - option as No, then the entire stamp duty can be paid online and there is no need to purchase the Stamp Paper/ e-Stamp papers. Details
51

Digitize land records at sub-registrar's office and make it available on an online system

Approved View File View URL Land records at all the sub- registrar office in the state are digitised. The records can be seen online and the registered deeds can be downloaded as well. The attached file demonstrates the complete functionality of the system. Details
57

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
58

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
59

Design and implement a system that allows online application and payment without the need for a physical touch point for document submission and verification

Approved View File View URL The complete process of entering property details, calculation of property MVR, Stamp Duty etc. including online payment of Stamp Duty and Registration Fees has been enabled. Department has made the registration on Stamp Paper optional and a deed/ document can be registered on plain paper while the party can pay the stamp duty including the stamp paper fees online. Details
60

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
61

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
62

Enact a comprehensive formal building code applicable to the entire State

Approved View File View URL It may be referred from the attached file that the Bihar Building Bye-laws 2014 is applicable to the whole state. Further, please refer to the order issued by Bihar Industrial Area Dev. Authority (BIADA) in the attached file too. It is clearly mentioned that maps for the industrial units in the BIADA area i.e. in the designated industrial areas to which land is allotted after 23.09.2010 are to be approved by the registered/authorised technicals persons of the local bodies. Details
64

Ensure that the building code/building bye-laws includes accreditation programs and clear responsibilities and liabilities for professionals including architects and engineers engaged in the construction process.

Approved View File View URL The Bihar Building Bye-laws, 2014 clearly mentions the accreditation programs and responsibilities of professionals including architects and engineers. The responsibilities are across all the stages of the construction. It also has clear penal provisions in case of any default made by the professionals. Details
69

Define mandatory qualifications for architects, structural engineers and contractors

Approved View File Details
70

Implement a system to allow approval based on third party certification (during construction and/or completion stage, as applicable) of structural design and architectural drawings by authorized structural engineers and architects respectively across all ULBs and IDCs

Approved View File View URL There is a system to issue approval based on third party certification (during construction and/or completion stage etc.) of structural design & architectural drawings across all ULBs/IDCs. The attached file shows the excerpts of Bihar Building Bye-laws where provisions and responsibilities of registered professionals are clearly mentioned. All the ULBs (for e.g. Patna Municipal Corp.-ref mentioned URL) in the state have published list of registered professionals who can do certification. Details
71

Allow authorized architects to issue the completion certificate at all ULBs and IDCs, instead of requiring a separate completion certificate to be issued

Approved View File Details
75

Establish a dedicated conflict resolution mechanism for land and construction permits.

Approved View File Details
76

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook regarding the application and approval procedure is placed on the official website of the relevant department. The guidebook clearly lists the required documents. Relevant excerpts of the guidebook is attached in the file here. Details
77

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
81

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Procedure and comprehensive list of all documents that need to be provided for getting NOC for tree felling on land notified as forest area and on government land other than notified forest area and which is presently applicable in the State is available on department website. Details
82

Define clear timelines mandated through legislation for approval of complete application

Approved View File Timelines for approval of complete application in both the cases i.e. in case of NOC for tree felling on land notified as forest area and on govt. land other than notified forest area has been mandated through legislation in the State. Details
86

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The state fire office is responsible to issue the NOC for fire. The state fire office works under the purview of Home (Police) Dept. As per the circular of the Dept. dated 25 feb 2016, a self explanatory guidebook for obtaining NOC (process and procedures) is placed on the website. The attached file explains how to download the guidebook. Details
87

Define clear timelines mandated through legislation for approval of application

Approved View File Details
91

Enact a list of green industries applicable for the State.

Approved View File complied Details
92

Exempt select green industries from pollution control board clearances

Approved View File Details
93

Allow for auto-renewal of Consent to Establish (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View File Details
94

Allow for auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View File Details
95

Issue Consent to Operate licences that are valid for a minimum period of 5 years or more

Approved View File Details
96

Issue Consent to Establish licences that are valid for a minimum period of 5 years or more

Approved View File Details
97

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
98

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
99

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
100

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Relevant Screenshots attached. Details
101

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
102

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
103

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
104

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
105

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Relevant Screenshots attached. Details
106

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
107

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
108

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
109

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File IMPORTANT NOTE Getting authorization under Hazardous Waste Management from BSPCB is free of cost i.e. No fee is applicable for this provided the respective applicant fulfils the laid conditions & provides all requisite information to BSPCB. This is why online system does not have component or facility for fee payment for authorization under Hazardous Waste Management. Details
111

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
112

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
113

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
114

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
115

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Relevant Screenshots Attached. Details
116

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
117

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
118

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
119

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
120

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
121

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
122

Mandate the submission of a single integrated return under all Labour Laws

Approved View File Details
125

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Document has been revised based on the feedback received from DIPP. Details
126

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
127

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
128

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL It may be noted that the respective user can only download the certificate for their own application. For demonstration purpose, we have included the relevant screenshot. Details
129

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
130

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Document has been revised based on the feedback received from DIPP. Details
131

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
132

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
133

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL It may be noted that for Approval of plan and permission to construct extend or take into use any building as a factory under the Factories Act, 1948 related services, no license is generated and only an approval is provided, The approval Letter can be downloaded by the respective users after login with their valid ID & Password.User can check the status of the application using the Application Status option. Details
134

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
135

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
136

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
137

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL login password provided in the document. Details
138

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL It may be noted that any user cannnot download the certificate of other user. Details
139

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
140

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
141

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
142

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
143

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Please note that the Registration of Principal Employer establishment under the provision of Contract Labour Act is issued in Form II (Please refer to the screenshot provided for Recommendation 153). For Licence of Contractors under the provision of Contract Labour Act, the license is issued as per Form VI as provided in the current attachment. It may also be noted that Form VI also captures the details of Principal Employer which is also captured in the input form. Details
144

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
145

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
146

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
147

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Login password provided in the document. Details
148

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
149

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
150

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
151

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
152

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
153

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL User ID: Portal_User Password:Root@123 Details
154

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
155

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
156

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
157

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
158

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File User ID: Portal_User Password:Root@123 Details
159

Allow third parties to easily verify approval certificates in the public domain

Approved View File User ID: Portal_User Password:Root@123 Details
160

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
161

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
162

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL It may be noted here that the Application Fee Payment Process for The Renewal of Licence under the Factories Act 1948, has been made online vide notification dated 26th February, 2016. In the guideline (For Reform No. 160), it has been clearly mentioned that payment process through Treasury Challan is a temporary arrangement and will be done away with once the online payment is enabled which has been the case for this reform measure. From 28th March, no physical application is being accepted. Details
163

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
164

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL login password inside the attached document Details
165

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
166

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
167

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL User ID: Portal_User Password:Root@123 Details
168

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL User ID: Portal_User Password:Root@123 Details
169

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL User ID: Portal_User Password:Root@123 Details
170

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
171

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
172

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Login password provided in the documents. Details
173

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
174

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Login Password provided in the document. Details
175

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File The provision/ requirement of renewal of the shops & establishment certificate has been abolished in the state. Please refer to the attached file which presents the notification in this regard and also the relevant excerpts of the rules (Section 3) for reference.(Highlighted in the boxes) Details
176

Define clear timelines mandated through legislation for approval of complete application

Approved View File The provision/ requirement of renewal of the shops & establishment certificate has been abolished in the state. Please refer to the attached file which presents the notification in this regard and also the relevant excerpts of the rules (Section 3) for reference.(Highlighted in the boxes) Details
177

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File The provision/ requirement of renewal of the shops & establishment certificate has been abolished in the state. Please refer to the attached file which presents the notification in this regard and also the relevant excerpts of the rules (Section 3) for reference.(Highlighted in the boxes) Details
178

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File The provision/ requirement of renewal of the shops & establishment certificate has been abolished in the state. Please refer to the attached file which presents the notification in this regard and also the relevant excerpts of the rules (Section 3) for reference.(Highlighted in the boxes) Details
181

Ensure that the regulator monitors reliability of supply and published information online.

Approved View File View URL The Bihar Electricity Regulatory Commission constantly monitors the reliability indices fixed for the DisComms. The DisComms submit the quarterly report to BERC. The report of the DisComms and the hearings by the BERC are placed on the website for public inormation. Details
182

Enact measures to ensure that the utility compensates customers for outages that go over a certain cap, or that a fine is imposed by the regulator if the outage cap is exceeded

Approved View File Details
183

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File View URL For South Bihar Power Distribution Co. Ltd. (SBPDCL) http://app.sbpdcl.in/Portal/TariffRegulation/31-Mar-2016-10-58Schedule%20of%20Tariff%20Rates%20_2016-17.pdf https://www.sbpdcl.co.in/Tariff_Regulation_PDF/81/K.%204989/SCHEDULE%20OF%20TARIFF%20RATES%20_2016-17.PDF For North Bihar Power Distribution Co. Ltd. (NBPDCL) http://app.nbpdcl.in/Portal/TariffRegulation/28-Mar-2016-16-51Tariff%20rates%20.pdf https://nbpdcl.co.in/Tariff_Regulation_PDF/77/K.%202077/TARIFF%20RATES%20.PDF Details
184

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
186

Ensure that users are provided a fixed cost estimate based on the load required for obtaining electricity connection in industrial area

 

Approved View File DisComms in Bihar provide a fixed cost estimate based on the load required for obtaining electricity connection. Details
187

Reduce the number of documents required for obtaining the electricity connection to only 2, namely proof of ownership/occupancy and authorization document (in case of firm/company)

Approved View File View URL Only two documents Address Proof and Identity Proof are required for obtaining HT/LT electricity connection in Bihar. Please check the petitition order dated 15.6.2016 by the BERC in the matter concerned. (Ref URL) Details
188

Stipulate that the charged electricity connection is provided within 15 days from the date of application

Approved View File Details
189

Allow third party inspection of internal installations

Approved View File View URL The State has a licensing board to issue licenses for electrical contractors, supervisors & wiremen. Their qualification parameters & selection process are well defined. The cotractors etc. are engaged by the promoter at the construction phase of the premises. Based on their certification, discomms provide the electricity supply.The format for certificate is also defined & published. Only in case of HT connections where transformers are installed, NOC of electrical inspectorate is required. Details
190

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
191

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
193

Design and implement a system for Value Added Tax (VAT) to be filed online

Approved View File View URL The state has a system for online filing of VAT return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
194

Design and implement a system for Central Sales Tax (CST) to be filed online

Approved View File View URL The state has a system for online filing of CST return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
195

Design and implement a system for Professional Tax to be filed online

Approved View File View URL The state has a system for online filing of PT return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
196

Design and implement a system for Luxury Tax to be filed online

Approved View File View URL The state has a system for online filing of LT return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
197

Design and implement a system for Entry Tax to be filed online

Approved View File View URL The state has a system for online filing of ET return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
198

Design and implement a system for Entertainment Tax to be filed online

Approved View File View URL The state has a system for online filing of ENT return. A user manual for filing return for various taxes is also placed on the website under the Help section. Details
199

Design and implement a system for Value Added Tax (VAT) to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including VAT to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1. Details
200

Design and implement a system for Central Sales Tax (CST) to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including CST to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1. Details
201

Design and implement a system for Professional Tax to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including PT to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10AAAAA1234B, Test Password: password@1 Details
202

Design and implement a system for Luxury Tax to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including LT to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1. Details
203

Design and implement a system for Entry Tax to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including ET to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1. Details
204

Design and implement a system for Entertainment Tax to be paid online

Approved View File View URL The state has designed and implemented a system incorporating payment gateway to allow all taxes including ENT to be paid online. A user manual for e-payments under various taxes/ acts is also placed on the website under the Help section. Please note that attached file pertains to older version of website which has been recently updated. The older version is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1. Details
205

Ensure that users are provided assistance for e-filing at service centers

Approved View File View URL An elaborated set up for providing help in e-filing, return and registration has been created in the state along with circle wise facilitation centres. A complete detail is placed on the website. Details
206

Establish a helpline providing basic services assisting users in preparing and filing returns

Approved View File View URL An elaborated set up for providing help in e-filing, return and registration has been created in the state along with circle wise facilitation centres. A complete detail is placed on the website. Details
208

Implement a system for risk based audit related to tax compliance

Approved View File View URL The state has a system of tax database and has a computerised system in place for conducting the audit of dealers. The criteria that define the risk parameters for selecting a dealer for audit are clearly defined though government notifications. The notified criteria are built in the computerised system for audit. The attached file exhibit the criteria decided in different FYs. It also illustrates a complete walkthrough of the computerised system for carrying out audit. Details
209

Introduce a system for advance tax ruling for State level taxes on the lines of Income Tax Act

Approved View File View URL An elaborate provisions for advace tax is created there in the Bihar Value Added Tax Act, 2005 and Bihar Value Added Tax Rules, 2005. Details
210

Publish forms relating to information captured at check posts been made available online

Approved View File View URL The state has created a provision for dealers/entrepreneurs to generate waybills, transit forms and other check post related forms through an online interface. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Test Id: 10050000001, Test Password: password@1 Details
212

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for VAT e-registration is available on official website under Help e-registration section. The guidebook and the user manual clearly mention the documents required for the registration. The attached file shows the releveant excerpts from the guidebook and user manual. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website. Details
213

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL A clear timeline of max. 15 days was stipulated vide Bihar VAT Rule 2005. Subsequently vide circular dated 15.07.2015 (a year back) it was reduced to 1 day. The attached file exhibits the relevant circular. (Ref. reco. no. 7. For ref., the attached file also exhibits excerpts of Bihar VAT Rules mentioning clear timeline of 15 days. The website of the Deptt. has been recently updated. The attached file pertains to the older version of website which is functional and linked with newer version. Details
214

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for VAT registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
215

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for VAT. Details
216

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
217

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for CST e-registration is available on official website under Help e-registration section. Details
218

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
219

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for CST registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
220

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for CST. Details
221

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
222

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for PT e-registration is available on official website under Help e-registration section. Details
223

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
224

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for PT registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
225

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for PT. Details
226

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
227

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for ET e-registration is available on official website under Help e-registration section. Details
228

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
229

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for ET registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
230

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for ET. Details
231

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
232

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for ENT e-registration is available on official website under Help e-registration section. Details
233

Define clear timelines mandated through legislation for approval of complete application

Approved View File Details
234

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for ENT registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
235

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for ENT. Details
236

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
237

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive guidebook and a user manual for LT e-registration is available on official website under Help e-registration section. Details
238

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL In the light of the amendment made on 2.2.16, the rule 3 sub-rule (2) of Bihar Taxation on Luxuries in Hotels Rules, clearly reads as-On receipt of an application for registration the Officer-in-charge of the circle after verifying or causing to be verified the particulars furnished by the applicant grant him a registration certificate in Form LT-II within a period not exceeding thirty days from the date of receipt of the said application. Thus the timeline is clearly defined as 30 days. Details
239

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The system for online filing of application for LT registration and uploading the requisite documents has been created. It is fully functional. The status of application can also be tracked online. A user manual has also been developed and placed on the website under Help e-registration section. Please note that the website of the deptt. has been recently updated. The file shown here pertains to the older version of the website which is also functional and linked to newer version. Details
240

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The state has implemented the online system for downloading the registration certificate for LT. Details
241

Allow third parties to easily verify approval certificates in the public domain

Approved View File Details
242

Differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all labour laws

Approved View File Details
243

Exempt low risk industries with a history of satisfactory compliance from labour compliance inspections, or allow self-certification in lieu of conducting physical inspections under all Labour laws

Approved View File Details
244

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber, and Green under all environment/pollution laws

Approved View File Details
245

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View File Details
247

Allow for synchronized/joint- inspection under all of the following acts
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III. Inspection under The Maternity Benefit Act, 1961
IV. Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable)
VI. Inspection under The Labour Welfare Fund Act (as applicable)
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File Details
248

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL A detail procedure for inspection and prescribed format for inspection report is well published on the official website www.biharcommercialtax.gov.in Details
250

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
251

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL The state has implemented the online system for downloading the VAT inspection report concerned to a dealer. Details
252

Design and implement a system for computerized allocation of inspectors

Approved View File The state has a computerised inspector allocation system linked to online application and approval system. The system enables the authority to process the application online, issue the registration certificate and also allocate it to an inspector as per her jurisdiction for physical verification. The inspector has also been provided with an online workspace where she can see her workflows and submit reports. The attached file clearly illustrates the process for both the officers. Details
253

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL A comprehensive guidebook for issue of NOCs, certificates, clearances and approvals is placed on the website of the Urban Development and Housing Dept. of Bihar. The attached file clearly mentions the website address and how to reach the guidebook. Relevant excerpts of the guidebook is placed in the attached file explaining the procedure. It also shows the standard format prescribed by the Dept. for inspections. Details
258

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Details
263

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL A comprehensive guidebook regarding the inspection procedure and checklist is placed on the concerned department web site. Please refer to the attached file which shows that how to obtain the guidebook on the site and also shows the relevant excerpts of the guidebook. Details
268

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Please note that their is joint inspection and a single visit is made to the premise. Therefore there are no multiple visits under various labour laws Details
269

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
270

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
271

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
272

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
273

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
274

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
275

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
276

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
277

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
278

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
279

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
280

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
281

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
282

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
283

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
284

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
285

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
286

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
287

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
288

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
289

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
290

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
291

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
292

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
293

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
294

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
295

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
296

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
297

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
298

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
299

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
300

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
301

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
302

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
303

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
304

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
305

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
306

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
307

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
308

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
309

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File Details
310

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Pls note that the Department has implemented joint inspection system. Hence, there is a consolidated checklist for all Acts and a common inspection is carried out under all Acts. Details
311

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
312

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL In case the inspection report is not submitted within 48 hours, then the system does not allow the officer to submit the inspection report. Officer can only submit the inspection report after it has been approved by the competent authority. Details
313

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL User can login and download the Inspection cum Violation Report. Details
314

Design and implement a system for computerized allocation of inspectors

Approved View File View URL It may be noted that the State have mandated through a circular that a joint inspection will be carried out under all Labour Related Laws. The system is based on that principle and there is only one common compliance inspection checklist. Further, the units are selected based on computerized risk assessment. The system allocates the inspectors to the short-listed units automatically. Officers can access their respective checklist, prepare and submit their report under their respective acts. Details
315

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The system has provision that the same inspector will not inspect the same establishment twice consecutively. Since, the system has been implemented only 4 months back, the name of the last inspector is being shown as not applicable. It may be noted that an establishment in Red category can be inspected once every year and only after a period of year this will be visible in the live system. It may also be noted that the Government has come out with a notification in this regard. Details
316

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Details
317

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File Details
318

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
319

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File Details
320

Design and implement a system for computerized allocation of inspectors

Approved View File Details
321

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File Details
322

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File Details
323

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File Details
324

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
325

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File Details
326

Design and implement a system for computerized allocation of inspectors

Approved View File Details
327

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File Details
335

Publish model contract templates and guidelines on department’s website that may be used for commercial contracts

Approved View File View URL The draft commercial contracts template is published on Udyog Samwad portal - One Stop portal for grievance redressal. Details
338

Design and implement a system to allow for publishing e-cause lists for commercial disputes in District courts/Commercial courts

Approved View File View URL The publishing of e-Cause List for all type of cases has been made online. Details

Back
Designed, Developed and Hosted by National Informatics Centre. Contents Providedand Maintained by Department of Industrial Policy and Promotion