header Image
UTTARAKHAND
Implementation Percentage
18.28%

YES
68
NO
304
N/A
0
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Mandate online filing of single integrated return and applicable payments under all Labour Laws

Approved View File View URL Order no. 1303F/EoDB/2017, Dated: 17-10-2017 to Mandate Online filing of Single Integrated return Details
6

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Registration and grant and renewal of license under The Factories Act, 1948 have been notified under The Uttarakhand Right to Services Act, 2011 Details
7

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Notification stating that all applications will be filed online onwards: 1463 (1)/VIII/17-31(Labour)2015 dated: 04-10-2017 Details
8

Ensure that the system allows the user to download the final signed approval certificate from the online portal

Approved View File View URL Username: demouser Password: demo@123 Details
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Notification no 1463 (1)/VIII/17-31(Labour)2015 dated: 04-10-2017 stating that all applications will be filed online onwards Details
13

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Username: demouser Password: demo@123 Details
17

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Press release informing online application under The Indian Boilers Act, 1923 on 1 Feb 2016 Details
18

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Username: demouser Password: demo@123 Details
31

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Notified under Uttarakhand Enterprises Single Window Facilitation and Clearance Act, 2012 as well as Uttarakhand Right to Services Act, 2011 Details
37

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Press release informing online application under The Uttarakhand Dookan Aur Vanijya Adhisthan Adhiniyam, 1962 on 1 Feb 2016 Details
38

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Username: demouser Password: demo@123 Details
42

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Notification stating that all applications will be filed online onwards: 1463 (1)/VIII/17-31(Labour)2015 dated: 04-10-2017 Details
43

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Username: demouser Password: demo@123 Details
49

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Sample Certificates 1. DDDN000035 2. DHWR000008 3. DDDN000030 Details
84

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Users can easily verify approval certificates from the e-registration portal of Stamps & Registration Department by logging into the system with their PDE credentials. Details
91

Mandate synchronized/joint- inspection under all of the following acts: 
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III.  Inspection under The Maternity Benefit Act, 1961
IV.  Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable) 
VI. Inspection under The Labour Welfare Fund Act (as applicable) 
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File View URL Mandated through order no 1737(1)/VIII/31(Labour)/2015 Details
110

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Order no. 162/32-H-V; dated October 23, 2017 for mandating that same inspector will not inspect the same establishment twice consecutively. Mandate uploaded online. Details
118

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Page 3 of Notitifcation no 1737(1)/VIII/31(labour)/2015; 21-01-2016 Details
121

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Notification No 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
124

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
127

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
130

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
133

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
136

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Mandated through Office order number 1737(1)/VIII/31(labour)/2015; 21-01-2016 Details
139

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
142

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Mandated through order no 1737(1)/VIII/31(labour)/2015; 21-01- Details
145

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Mandated through order no. 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
148

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Mandated through order no. 1737(1)/VIII/31(labour)/2015; 21-01-2016 Details
151

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Mandated through Order No. 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
154

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Mandated through Order No. 1737(1)/VIII/31(labour)/2015; 21-01-2016 Details
157

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Mandated through Order No. 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
160

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Mandated through Order No. 1737(1)/VIII/31(labour)/2015; 21-01-2016 Details
163

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Mandated through Order No. 1423/H.Q.Vividh/2016; dated. 06-04-2016 Details
168

Design and implement a system for computerized allocation of inspectors

Approved View File View URL 1. Regional Office allots cases to inspectors based on their jurisdiction 2. The inspector who has gone for the last inspection cannot be selected for allotment. This is so that the same inspector does not visit the establishment consecutively 3. The inspection report is submitted through their workspace Details
169

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL 1. Regional Office allots cases to inspectors working in their jurisdiction 2. The inspector who has gone for the last inspection cannot be selected for allotment, this is so that the same inspector does not visit the establishment consecutively 3. The Inspection report is submitted through their workspace Clarification about applicability of Acts for such mandate provided Details
174

Design and implement a system for computerized allocation of inspectors

Approved View File View URL 1. Regional office allots cases to inspectors working in their jurisdiction 2. The inspector who has gone for the last inspection cannot be selected for allotment. This is so that the same inspector does not visit the establishment consecutively. 3. The inspection report is submitted through their workspace. Clarification about applicability of Acts for such mandate provided Details
175

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL a. Regional Office allots cases to inspectors working in their jurisdiction b. The inspector who has gone for the last inspection cannot be selected for allotment, this is so that the same inspector does not visit the establishment consecutively c. The inspection report is submitted through their workspace. Clarification about applicability of Acts for such mandate provided Details
176

Establish a dedicated single window agency as the sole point of contact for setting up a business in State

Approved View File View URL Section 4 of the The Uttarakhand Enterprises Single Window Facilitation and Clearance Act, 2012 Details
180

Design and implement an online single window system with functionality for online application submission, payment and approvals and mandate that all applications are submitted online

Approved View File View URL Application Flow of an application through Single Window System i.e. www.investuttarakhand.com with functionalities for online application submission, payment and approvals Details
181

Implement a standardized online Common Application Form (CAF) combining applications of all services wherein common information such as applicant`s name, project details, address etc. and common documents are required to be provided only once through single window system

Approved View File View URL Combined Application Form Section 6(1) and 6(2) of The Uttarakhand Enterprises Single Window Facilitation and Clearance Act, 2012. Application Flow for the Document Management System whereby all the required Documents and Application Form Fields are taken from the applicant only once. Details
204

Mandate that all queries/clarifications related to investor`s application are sought once and within 7 days of receiving the application

Approved View File View URL Notification of The Uttarakhand Enterprises Single Window Facilitation and Clearance Act, 2012. Timeline for all queries/ clarifications notified under the Single Window Act to 5 days. Details
205

Ensure that the Single Window System sends out SMS/e-mail notification to the applicant as and when the application is submitted and/or query is raised and/or application is approved/rejected

Approved View File View URL The Applicant gets SMS at the registered number at every stage of the application, including submission, queries, approval/rejection (screenshots attached of the alerts / notifications received on the registered phone number) Details
230

Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Sewerage, Electricity, Labour (such as Factory license), Water Department and internal departments responsible for granting construction permits in urban areas and IDCs

Approved View File View URL Provisions in the Uttarakhand Building Bye Laws and Regulations 2011 (Amendment 2016) regarding Single Joint Site Inspection (Page 171) Details
238

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Forest Department portal for Exempted/ Non-exempted Tree Felling NOC Details
257

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Ganga XGN has been online since 2009 and the department only accepts online applications Details
258

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL In Ganga-XGN, the user can view the following through the - Legal, CCA orders link 1. Legal Orders 2. Consent Orders (CTE / CCA) 3. General letter to industry by PCB 4. Provisional Orders 5. Uploaded old orders by self The submitted URL is working. Details
262

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Ganga XGN has been online since 2009 and the department only accepts online applications Details
263

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL In Ganga-XGN, the user can view the following through the - Legal, CCA orders link 1. Legal Orders 2. Consent Orders (CTE / CCA) 3. General letter to industry by PCB 4. Provisional Orders 5. Uploaded old orders by self Submitted URL is working Details
267

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Ganga XGN has been online since 2009 and the department only accepts online applications Details
268

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL In Ganga-XGN, the user can view the following through the - Legal, CCA orders link 1. Legal Orders 2. Consent Orders (CTE / CCA) 3. General letter to industry by PCB 4. Provisional Orders 5. Uploaded old orders by self Submitted URL is working Details
269

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Facility exists to see all the consent orders by viewing the consent register open the URL and click on - Consent Register Details
272

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Ganga XGN has been online since 2009 and the department only accepts online applications Details
273

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File View URL In Ganga-XGN, the user can view the following through the Legal, CCA orders link - 1. Legal Orders 2. Consent Orders (CTE / CCA) 3. General letter to industry by PCB 4. Provisional Orders 5. Uploaded old orders by self Submitted URL is working. Details
274

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Facility exists to see all the consent orders by viewing the consent register open the URL and clicking on consent register Details
277

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Ganga XGN has been online since 2009 and the department only accepts online applications Details
278

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File View URL In Ganga-XGN, the user can view the following through the Legal, CCA orders link 1. Legal Orders 2. Consent Orders (CTE / CCA) 3. General letter to industry by PCB 4. Provisional Orders 5. Uploaded old orders by self Submitted URL is working Details
279

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Facility exists to see all the consent orders by viewing the consent register. Open the URL and click on consent register Details
284

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File View URL Public notice regarding implementation of revised tariff rate Details
285

Reduce the number of documents required for obtaining the electricity connection to only two i.e. proof of ownership/occupancy and authorization document (in case of firm/company)

Approved View File UPCL order notifying that only 2 documents are required for new connection: Office Order /D (O)/UPCL M-20; dated: April 02, 2016 Details
286

Allow third party inspection of internal installations and ensure that majority of establishments avail this provision

Approved View File Office order appointing UPCL engineers for inspection purposes: No. 10700/ / /2015-16 Details
287

Ensure that users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas of State and ensure these charges (demand note) is generated through the online system

Approved View File View URL UPCL online fixed cost estimator and online demand note generation Details
288

Implement a system that allows online application submission, payment and tracking of status without the need for a physical touch point for document submission for new electricity connection and mandate that all applications are submitted online

Approved View File View URL Office order for mandating that all application will be submitted online: 2531/nide (parichaalan)/Upakaali/M-20 Details
292

Allow third parties to easily verify the authenticity of electricity connections and respective premise/entity/individual through online system in the public domain

Approved View File View URL Third Party Verification Link in public domain - Existing/ New Customer Details
297

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Third party verification link Test application no.: 2017001 Details
299

Define clear timelines mandated through legislation for obtaining water connection by all concerned agencies

Approved View File View URL Mandated under the Uttarakhand Right to Services Act, 2011 Details
300

Design and implement an integrated system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification from all concerned agencies and mandate that all applications are submitted online

Approved View File View URL Uttarakhand Jal Sansthan has an online system that provides online application for new connection, bill information, online bill payment, status tracking, payment history, etc. An investor willing to apply for a Water Connection requires the Land Allotment Procedure to be completed. Once land has been allotted, the user can apply for water connection for the same plot of Land. Details
382

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Right to service notification mentioning the timeline for Drug Manufacturing License: General Administration Department Notification No. 1337/XXXI (13) G/ 2011 Dated: 28 Oct 2011 Details
411

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Order no. 8/2/Ni.Vi. Ma. Vi./eodb dated October 30,2017 mandating that same inspector will not inspect the same establishment twice. Mandate uploaded online. Details

Back
Terms & Conditions | Privacy Policy | Copyright Policy | Hyperlinking Policy | Disclaimer | Site Map | Help
CONNECT WITH US
Designed, Developed and Hosted by National Informatics Centre. Contents Providedand Maintained by Department of Industrial Policy and Promotion