header Image
DAMAN & DIU
Implementation Percentage
32.46%

YES
99
NO
206
N/A
67
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
3

Introduce a provision for issuing Factory License and all subsequent renewals with validity of 10 years or more

Approved View URL Details
5

Publish information about the procedure and comprehensive list of documents on the Department`s web site

Approved View URL All the information required for reform is available on the website. The reform have been implemented as per above link. Details
8

Ensure that the system allows the user to download the final signed approval certificate from the online portal

Approved View URL User can be download final approval certificate from given URL Circular of the same can be download from http://labourdaman.in/web/wp-content/uploads/2017/11/Circular-dated-1.11.2017-regarding-downloading-the-final-approval-certificate1.pdf Details
9

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Third parties can easily verify the approval certificate from the given URL Details
10

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Checklist, Registration Form and Procedure are shown in bottom of page at link of APPROVAL OF PLANS For Checklist-http://labourdaman.in/web/wp-content/uploads/2017/03/CheckList_ApprovalOfPlan.pdf For Procedure-http://labourdaman.in/web/wp-content/uploads/2017/10/Flow-Chart-2017-Approval-Plan.pdf Details
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
13

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
14

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
17

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View URL Not applicable due to less than 10 application in a year Details
18

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View URL Not applicable due to less than 10 application in a year Details
19

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Third parties can easily verify the approval certificates from the given URL Details
20

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View URL Procedure has been uploaded as per URL. Checklist is available at http://labourdaman.in/web/wp-content/uploads/2017/04/Boiler-Act-Service_3.pdf Details
22

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
23

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
24

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
25

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View URL Procedure has been uploaded as per given URL and Checklist is available on http://labourdaman.in/web/wp-content/uploads/2017/04/BoilerAct_Boiler_Erection_CheckList_service4.pdf Details
27

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
28

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
29

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
33

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL User can download final signed approval certificate from the given URL. Screen shot attached. Circular of the same is available at http://labourdaman.in/web/wp-content/uploads/2017/11/Circular-dated-1.11.2017-regarding-downloading-the-final-approval-certificate1.pdf Details
34

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Third parties can easily verify the approval certificate at given URL Details
35

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL Application procedure and list of documents required, checklist is uploaded on Website - http://labourdaman.in/labour-employment-acts/the-goa-daman-diu-shops-establishments-act-1973/ Details
38

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
40

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL The list of documents have been uploaded on the Website - http://labourdaman.in/registration/ Details
42

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Details
43

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Details
44

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Third parties can easily verify the approval certificate from the given URL Details
45

Publish information about the procedure and a comprehensive list of documents on the Department`s web site

Approved View File View URL List of documents uploaded on the Website - http://labourdaman.in/the-building-and-other-construction-workers-regulation-of-employment-and-conditions-of-service-act-1996/ Details
49

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Third parties can easily verify the approval certificates from the given URL Details
50

Publish information on about the procedure and a comprehensive list of documents that on the Department`s web site

Approved View File View URL The list of documents have been uploaded on the Website - http://labourdaman.in/the-inter-state-migrant-workmen-act-1979/ Details
52

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
53

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
54

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
55

Establish a specialized division/bench under the High Court to hear commercial disputes

Approved View URL On accordance with the provision of the Commercial Courts / Division / Appellate Divisions of High Courts Act, 2015, the Commercial Division / Bench has been constituted in the High Court of Judicature at Mumbai Details
56

Establish specialized commercial courts (in major towns/cluster of district so as to cover the whole State) to hear and resolve the commercial disputes

Approved View URL The principal District and session Judge UT of Daman & Diu has been designated as Judge of the Commercial Court for UT of Daman & Diu Details
58

Ensure that the time standards for commercial disputes are adhered for the following key court events:  
i.    First hearing; 
ii.    Filing of the statement of defense; 
iii.    Completion of the evidence period;
iv.    Filing of testimony by expert; and 
v.    Submission of the final judgment

Approved View File Details
59

Limit the maximum number of adjournments that can be granted in commercial disputes

Approved View File Details
60

Limit the adjournments to unforeseen and exceptional circumstances

Approved View File Details
79

Provide model deed templates for sale, gift, lease, mortgage and rent in downloadable and editable format along with instructions to use them

Approved View File View URL Reform Implemented. User will select Template deed from given URL (ie. Sale Deed, Gift Deed, Lease Deed, etc) Editable Format also available for download in .docx format Details
81

The online system should have the facility of auto calculation of the applicable fee and stamp duty as per the valuation of the property

Approved View URL Details
84

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL To download the final signed approval certificate please click on DOWNLOAD CERTIFICATE OF PROPERTY REGISTRATION seen at bottom of the page and over the Contact Address. Screenshot attached Details
89

Differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all the labour laws

Approved View URL Inspection requirements for medium and high industries are available under checklist at http://labourdaman.in/inspection-procedure/ Details
90

Exempt low risk industries with a history of satisfactory compliance from labour compliance inspections, or allow self-certification in lieu of conducting physical inspections under all the Labour laws

Approved View URL Details
91

Mandate synchronized/joint- inspection under all of the following acts: 
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III.  Inspection under The Maternity Benefit Act, 1961
IV.  Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable) 
VI. Inspection under The Labour Welfare Fund Act (as applicable) 
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File View URL All the above Acts have been covered for synchronized/joint- inspections. Details
92

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber(Orange), and Green under all environment/pollution laws

Approved View URL Please see at Pg. No. 1, Order No. 279 dated 22/09/2017 Details
94

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View URL Green category consent are granted for 15 years Details
102

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Details
103

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
105

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
106

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
107

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
108

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
109

Design and implement a system for computerized allocation of inspectors

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
113

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Details
114

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
118

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at above link. Details
119

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
122

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View URL Details
124

Mandate online submission of inspection report within 48 hours to the Department

Approved View File Details
128

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View URL Please refer Check List Sr. No. 3 Details
130

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at above link. Details
131

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
136

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at the above link. Details
137

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
142

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at the above link. Details
143

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Details
148

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at the above link. Details
154

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at the above link. Details
155

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View URL Details
160

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The Inspection report to be uploaded within 24 hours at the above link. Details
164

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View URL Implemented. Please see in URL at Pg. No. 5 to 13, Order No. 280 dated 27/09/2017 Details
166

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Implemented. Please see in URL at Pg. No. 4, Order No. 281 dated 27/09/2017 Details
167

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Reform Implemented. Inspection Report can be viewed and available for download at given URL both Inspection Report under Water & Air Act are common in one certificate Details
169

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL The above is implemented as per above link provided. Details
170

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View URL Implemented. Please see in URL at Pg. No. 5 to 13, Order No. 280 dated 27/09/2017 Details
172

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Implemented. Please see in URL at Pg. No. 4, Order No. 281 dated 27/09/2017 Details
173

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Reform Implemented. Inspection Report can be viewed and available for download at given URL both Inspection Report under Water & Air Act are common in one certificate Details
175

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL The above is implemented as per above link provided. Details
176

Establish a dedicated single window agency as the sole point of contact for setting up a business in State

Approved View File Details
177

Ensure that the single window agency has been set up through a legislation

Approved View File Daman & Diu is a Union Territory without legislature. It is governed by an Administrator. The uploaded order for constitution of single window agency is approved by an Administrator of Daman & Diu. Details
178

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for issuing all approvals being provided by single window agency

Approved View File Reform implemented Details
179

Define clear timelines mandated through legislation or through notification under the Public Service Delivery Guarantee Act for issuing intent letter, granting sanction and disbursal of applicable incentives as per the industrial/sectoral policy in the State

Approved View File Reform implemented. Please see at Pg. No. 3, Sr. No.9 Details
183

Ensure `Registration certificate of Establishment Inter State Migrant Workmen(RE&CS)Act,1979 (License of Contractor Establishment)` is provided as a service through the online single window system facilitating the online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
191

Ensure `Factory building plan approval` (under the Factories Act, 1948) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year. Details
204

Mandate that all queries/clarifications related to investor`s application are sought once and within 7 days of receiving the application

Approved View File View URL Reforms implemented Details
210

Define objective criteria, applicable for all industrial land, for evaluating land allotment application for industrial use

Approved View File Details
211

Publish information about the procedure and a comprehensive list of documents required to be submitted for land allotment on the web site

Approved View File Details
212

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for land allotment

Approved View File Details
213

Design and implement a land allotment system that allows online application and payment without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Details
214

Ensure that the system allows users to download the final signed land allotment certificate from the online portal

Approved View File Details
215

Allow third parties to easily verify the land allotment certificates in the public domain

Approved View File Details
216

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for processing of application for conversion of land/ change in land use (from the date of application) for land outside of industrial parks/IDCs

Approved View File Details
217

Enact a comprehensive uniform building code/building by-law applicable to the entire State

Approved View File View URL The uniform building code/building by-law is applicable to entire State. Screen shot attached with following link (Other link given at bottom of page) http://daman.nic.in/town-and-country-planning.aspx Details
218

Ensure that the uniform building code/building by-law include provisions for risk-based classification of buildings

Approved View URL Details
221

Develop legally valid master plans/zonal plans/land use plans for all urban areas and make it available online in public domain

Approved View URL Details
222

Establish a dedicated conflict resolution mechanism for land and construction permits

Approved View URL Details
223

Conduct a survey of all industrial areas of State and create a list of plots with trees and publish online a comprehensive information on type of trees

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
224

Publish online the detailed information on applicable replanting requirements for plots with varying tree populations

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
230

Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Sewerage, Electricity, Labour (such as Factory license), Water Department and internal departments responsible for granting construction permits in urban areas and IDCs

Approved View URL Details
233

Stipulate that construction permits are provided within 45 days: 
i. Building Plan approval is provided within 30 days
ii. Plinth Inspection is done within 7 days of intimation
iii. Final completion/occupancy certificate is provided within 8 days ( 7 days for inspection + 1day for issuing the certificate)

Approved View URL Details
235

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL The reform are less than 10 per year. The order signed by the Competent Authority is uploaded and link provided. More ever, the other recommendation related to the services including procedure, documents, checklist & time limit are complied with and the evidence is uploaded at link.(we have uploaded the evidence and link is http://daman.nic.in/websites/dy_conservator_of_forest_daman/documents/2017/Tree_Felling_Procedure/Tree-Felling-Procedure.pdf). Details
237

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
238

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
239

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
242

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
243

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
244

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Online system of these reforms are not required as these service has less than 10 applications in a year Details
245

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View URL User has to select required NOC from the Procedure for obtaining Fire NOC from Quick Link Details
246

Define clear timelines mandated through legislation for approval of application

Approved View File View URL Reform Implemented. Please Sr. No. 5 of uploaded file/URL Details
249

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL User has to select required NOC from the Issued NOC Link available on left pane of webpage Screenshot is uploaded and available to view Details
253

Issue Consent to Operate with a validity period of 5 years or above

Approved View File View URL Details
257

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Online payment facility will available shortly Link :- http://pccdaman.info/pdf/p04.pdf Details
258

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Screenshot uploaded Details
261

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Reform Implemented. Please check URL/Attached file Details
262

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Screenshot uploaded Details
263

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Screenshot uploaded Details
268

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL User will download final signed certificate from the given URL. Screenshot is also attached. Details
271

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Reform Implemented. Please check URL/Attached file Details
273

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File Implemented. Screenshot till download the approval certificate is uploaded Details
276

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Reform Implemented. Please check URL/attached file Details
277

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Reform Implemented. Please check Screenshot as attached with given URL Details
278

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File View URL Implemented. User can be download final signed approval certificate online from the given URL. Screenshot attached. Details
283

Ensure that total outage cap is fixed by regulator for a quarter/year and the Discoms compensates customers for outages that go over the fixed cap

Approved View File View URL Please see in Schedule-III, Section-9, Page No. 12, 13 & 14 Details
284

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File View URL Details
286

Allow third party inspection of internal installations and ensure that majority of establishments avail this provision

Approved View File View URL Dealt by Central Electricity Authority (CEA) through Regional Inspection Organization (RIO). URL Uploaded. Details
287

Ensure that users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas of State and ensure these charges (demand note) is generated through the online system

Approved View File View URL Verification of Application is needed first. After verification link will be sent at user provided email address. Step 01 Applicant Verification. Step 02 Open Link From Email. Step 03 Fill Application From. Step 04 Enter Demand to Calculate Connection Charge. Details
288

Implement a system that allows online application submission, payment and tracking of status without the need for a physical touch point for document submission for new electricity connection and mandate that all applications are submitted online

Approved View File View URL Reform implemented at given URL. Full Screenshot is uploaded Details
299

Define clear timelines mandated through legislation for obtaining water connection by all concerned agencies

Approved View File View URL Please see Sr. No. 8 of given URL. File uploaded with highlight of timeline in respect of Water Connection Details
301

Ensure that users are provided assistance for e-filing at service centers

Approved View URL Users have to select USER MANUALS option for assistance of e-services Details
302

Establish a helpline providing basic services and assisting users in preparing and filing returns

Approved View URL Please see bottom of the page for Helpline numbers. Help Desk No. 0260-2260349 Toll Free No.18002330349 E-mail : ddvat-helpdesk-dd@nic.in Details
305

Introduce a system for advance tax ruling for State level taxes on the lines of Income Tax Act

Approved View File Details
320

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
321

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
322

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
323

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
324

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
342

Design and implement a system for online filing of Profession Tax

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
348

Design and implement a system for online payment of Profession Tax

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
356

Establish a formal investors facilitation center/bureau in State for investment promotion, industrial facilitation, regulatory reforms and obtaining user feedback

Approved View File Details
360

Mandate that the final profession tax registration certificate (where applicable) will be issued within at most one (1) working day from the date of submission of online application form

Approved View File Not Applicable in UT of Daman & Diu (Evidence attached) Details
363

Develop an online system available in public to publish real time status of applications submitted to the departments concerned for obtaining clearances

Approved View File View URL User has to provide application number and mobile number for current status of the application. Screenshot attached Details
371

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Not Applicable due to less than 10 application in a year Details
372

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Not Applicable due to less than 10 application in a year Details
377

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL Details
379

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Not Applicable due to less than 10 application in a year Details
380

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Not Applicable due to less than 10 application in a year Details
381

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View URL Details
383

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Not Applicable due to less than 10 application in a year Details
384

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Not Applicable due to less than 10 application in a year Details
385

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File Details
388

Reduce the number of documents required for obtaining trade license to only two: ID Proof and Lease Deed/Legal Occupancy

Approved View File Details
393

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File Due to less than 10 application in a year regarding Registration and Renewal under Legal Metrological Act, 2009, this reform is not applicable. Letter issued by competent authority is attached. Details
394

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File Due to less than 10 application in a year regarding Registration and Renewal under Legal Metrological Act, 2009, this reform is not applicable. Letter issued by competent authority is attached. Details
395

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Due to less than 10 application in a year regarding Registration and Renewal under Legal Metrologyl Act, 2009, this reform is not applicable. Letter issued by competent authority is attached. Details
396

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL Procedure available in URL and Checklist is uploaded Details
400

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Issued Certificate of Registration of Firms Details
401

Publish information about the procedure and a comprehensive list of documents required on the Department`s web site

Approved View File View URL Checklist uploaded Details
405

Allow third parties to easily verify the approval certificates in the public domain

Approved View URL Issued Certificate of Registration of Societies Details
406

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View URL Details
407

Design and implement a system for identifying licensees that need to be inspected

Approved View File Not applicable due to less than 10 application in a year Details
408

Mandate online submission of inspection report within 48 hours to the Department

Approved View URL Details
409

Allow licensees to view and download submitted inspection reports of at least past two years

Approved View File Not applicable due to less than 10 application in a year Details
410

Design and implement a system for computerized allocation of inspectors

Approved View File Not applicable due to less than 10 application in a year Details
411

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View URL Details
416

Define clear timelines mandated through the Public Service Delivery GuaranteeAct (or equivalent legislation) for registration

Approved View File There is no levies imposed by state and local bodies/Panchayat level. Only GST/VAT is implemented. Details
421

Publish tariff rates on the portal of discoms for new connection and all types of users

Approved View URL Details

Back
Terms & Conditions | Privacy Policy | Copyright Policy | Hyperlinking Policy | Disclaimer | Site Map | Help
CONNECT WITH US
Designed, Developed and Hosted by National Informatics Centre. Contents Providedand Maintained by Department of Industrial Policy and Promotion