header Image
MADHYA PRADESH
Implementation Percentage
28.49%

YES
106
NO
266
N/A
0
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Mandate online filing of single integrated return and applicable payments under all Labour Laws

Approved View File View URL Labour Department has introduced online filing of single integrated return and applicable payments under all Labour Laws Details
6

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has mandated fixed timeline for delivery of this service through Public Service Delivery Guarantee Act Details
7

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
8

Ensure that the system allows the user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department web portal allow user to download final digitally signed approval certificate Details
12

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
13

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Department has allowed the user to download final digitally signed approval certificate Details
17

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Registration under Boiler Act & Renewal is provided as a service through the online single window system , facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. Details
18

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL The system allows the user to download the final approval certificate online. Details
31

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for contractors under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 in Public Service Delivery Guarantee Act Details
33

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL User can download final digitally signed approval certificate on labour department portal Details
36

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration and Renewal under The Shops and Establishment Act in Public Service Delivery Guarantee Act Details
37

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
38

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented the online system for download of final approved certificate Details
41

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Principal Employer under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 in Public Service Delivery Guarantee Act Details
42

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Labour Department has a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
43

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented an online system for download of final approved certificate Details
46

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration under the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 in Public Service Delivery Guarantee Act Details
49

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Labour Department has implemented an online system to easily verify the approval certificates in the public domain Details
51

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Labour Department has notified timeline for Registration of Establishment under The Inter State Migrant Workmen (RE&CS) Act in Public Service Delivery Guarantee Act Details
53

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Labour Department has implemented the online system which allows the user to download the final signed approval certificate from the online portal Details
80

Design and implement a system that allows online application and payment for submission and verification of document and mandate that all applications are submitted online and mandate that all applications are submitted online

Approved View File View URL Department has implemented a system that allows online application and payment for submission and verification of document. Department has also mandated online submission of all applications through gazette notification dated 29 July 2015. Details
84

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Department has a system in place which allows user to download the final signed approval certificate from the online portal Details
91

Mandate synchronized/joint- inspection under all of the following acts: 
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III.  Inspection under The Maternity Benefit Act, 1961
IV.  Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable) 
VI. Inspection under The Labour Welfare Fund Act (as applicable) 
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File View URL Department has mandated joint inspection under all labour laws (as mentioned above) and department has issued the relevant notification for the same Details
110

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File It is mandated that the same inspector will not inspect the same establishment twice consecutively via order dated 11th September 2017 Details
121

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
124

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
125

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has introduced system where user is allowed to view and download submitted inspection reports of past two years i.e. since Jan 2015 Details
127

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
128

Publish a well-defined inspection procedure and checklist on department`s web site

Approved View File View URL Labour Department has published a well defined inspection procedure & a checklist required for Compliance Inspection under The Minimum Wages Act, 1948, on departments website Details
130

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
131

Allow establishments to view and download submitted inspection reports of at least past two years

Approved View File View URL Labour Department has implemented a system where user is allowed to view and download submitted inspection reports of past two year i.e. after Jan 2015 Details
133

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
136

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant orders to ensure the implementation of the timelines Details
139

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
142

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
145

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, and to ensure the implementation of the reform department has also issued the relevant notification Details
148

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department Department has also issued relevant notification to ensure the implementation of the timelines Details
151

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
154

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant notification to ensure the implementation of the timelines Details
157

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
160

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Labour Department has mandated the online submission of inspection report within 48 hours to the Department, Department has also issued relevant orders to ensure the implementation of the timelines Details
163

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Labour Department has mandated that same inspector shall not inspect the same establishment twice consecutively, to ensure the implementation of the reform department has also issued the relevant notification Details
166

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that inspection reports shall be submitted online within 48 hours Department has also issued the relevant notification and made it available online to spread the awareness amongst investors Details
169

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that same inspector will not inspect the same establishment twice consecutively Department has also issued the relevant notification and made it available online to spread the awareness amongst investors Details
172

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that inspection reports shall be submitted online within 48 hours Department has also issued the relevant notification and made it online to spread the awareness among investors Details
175

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has mandated that same inspector will not inspect the same establishment twice consecutively Department has also issued the relevant notification and made it online to spread the awareness among investors Details
176

Establish a dedicated single window agency as the sole point of contact for setting up a business in State

Approved View File View URL MP TRIFAC (MP Trade and Investment Facilitation Corporation) is acting as the Single Window Secretariat for Investment promotion and facilitation in the state. MP TRIFAC is dedicated Single Window Agency as the sole point of contact for setting up a business in State Details
177

Ensure that the single window agency has been set up through a legislation

Approved View File View URL MP TRIFAC is a single window agency for Madhya Pradesh, which is setup through a legislation- Investment Facilitation ACT 2008 Details
178

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for issuing all approvals being provided by single window agency

Approved View File View URL All the Approvals which are being provided through single window are notified under Public Service Delivery Guarantee Act Details
180

Design and implement an online single window system with functionality for online application submission, payment and approvals and mandate that all applications are submitted online

Approved View File View URL Industries department has implemented an online single window system with functionality for online application submission, payment and approvals without the need for a physical touch point for document submission and verification. The Department has also mandated that all applications are submitted online. Details
181

Implement a standardized online Common Application Form (CAF) combining applications of all services wherein common information such as applicant`s name, project details, address etc. and common documents are required to be provided only once through single window system

Approved View File View URL Online Common Application Form (CAF) has been implemented combining applications of all services wherein common information such as name of applicant, project details, address etc. and common documents are required to be provided only once through single window system. Details
184

Ensure `Registration under weights and measures, 1998` is provided as a service through the online single window system facilitating online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Registration under weights and measures, 1998, is provided as a service through online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate. The licenses/Registration provided by Single window portal are- a. License as Manufacturer of Weights & Measures, b. License as Dealer of Weights & Measures, c. License as Repairer of Weights & Measures, d. Registration as Packer/Importer Details
186

Ensure `Consent to operate (under Water Act & Air Act)` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Consent to operate (under Water Act & Air Act) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
189

Ensure `Permission for engaging contractor for labour` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Permission for engaging contractor for labour is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificates Details
190

Ensure `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Factories license is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificates Details
191

Ensure `Factory building plan approval` (under the Factories Act, 1948) is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Factory building plan approval, under the Factories Act, 1948, is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
193

Ensure `Change of land use` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File In Madhya Pradesh Change of land use is deemed approved in non- planned area. Investor is required to intimate the relevant authority. There is no need of submitting the application Details
198

Ensure renewal under `Factories license` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Renewal under Factories license is provided as a service through the online single window system facilitating online application submission, payments, tracking of status, approvals and issuance of the certificate Details
200

Ensure `electricity connection` is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Electricity connection is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals. Department has following three zones / Dicoms to provide electricity connection a. East zone, b. West zone & c. Central zone Each Discom has a separate online portal Details
201

Ensure `water connection` provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals

Approved View File View URL Water connection is provided as a service through the online single window system facilitating online application submission, payments, tracking of status and approvals Details
202

Publish information on the procedure, timelines and a comprehensive list of documents that are required to be submitted for applying for various incentives in the state

Approved View File View URL Department through online single window system has published the information on the procedure, timelines and a comprehensive list of documents that are required to be submitted for applying for various incentives in the state Details
205

Ensure that the Single Window System sends out SMS/e-mail notification to the applicant as and when the application is submitted and/or query is raised and/or application is approved/rejected

Approved View File State has integrated a mechanism on Single Window System to send out SMS or email notification to the applicant at every stage from application submission to query raised and application approval or rejection Details
206

Ensure that incentives under Industrial/Sectoral Policy are provided as a service through the online single window system (for intent letter, sanction and disbursement) facilitating online application submission and tracking of status and approvals

Approved View File View URL Such a system has been implemented wherein incentives under Industrial/Sectorial Policy are provided as a service through the online single window system (for intent letter, sanction and disbursement) facilitating online application submission and tracking of status and approvals Details
215

Allow third parties to easily verify the land allotment certificates in the public domain

Approved View File View URL State single Window system allows third party to verify the land allotment certificates in the public domain Details
230

Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Sewerage, Electricity, Labour (such as Factory license), Water Department and internal departments responsible for granting construction permits in urban areas and IDCs

Approved View File Department has mandated that a single joint site inspection shall be carried out by all concerned departments for granting construction permits in urban areas Details
232

Define clear timelines mandated through legislation for sanctioning of building permits in 30 days

Approved View File Department has defined clear timelines for granting building construction permits including all required approval in 30 days and notified the timelines under Public service Delivery Guarantee Act Details
237

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Department has implemented a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification. Department has also mandated that all applications for tree felling should be submitted online only. Details
238

Ensure that the system allows user to download the final signed approval certificate from the online portal

Approved View File View URL Final signed NOC for tree felling can be downloaded from MP e-nagarpalika portal Details
246

Define clear timelines mandated through legislation for approval of application

Approved View File Department has defined clear timelines for Fire NOC and notified the timelines under Public service Delivery Guarantee Act Details
248

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File View URL Department allows the users to download Final NOC from MP e-nagarpalika portal Details
252

Allow for auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification and ensure that majority of establishments avail this provision

Approved View File View URL MP PCB has allowed auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification for Green and Orange category of Industries To ensure that majority of establishment avail this facility, department has issued a notification in this regards, which mandates auto-renewal only through self - certification. From the date of issue of notification all industries (Green and Orange category) are using self-certifications for consent to operate renewals. Details
253

Issue Consent to Operate with a validity period of 5 years or above

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) issues Consent to Operate (CTO) with a validity period of 5 Years, 10 Years & 15 Years for Red, Orange and Green Industries respectively Department has also issued relevant notification & made it available on departments portal to spread the awareness Details
254

Issue Consent to Establish with a validity period of 5 years or above

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) issues Consent to Establish (CTE) with a validity period of 5 Years Department has also issued relevant notification & made it available on departments portal to spread the awareness Details
256

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has notified timeline for Application of Consent to Establish under the Water (Prevention and Control of Pollution) Act, 1974 in Public Service Delivery Guarantee Act Details
258

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Madhya Pradesh Pollution Control Board has implemented the online system to download the final signed approved certificate from departments portal Details
259

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has implemented an online system where third party can verify approval certificates in public domain Details
261

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has notified timeline for Application of Consent to Establish under the Air (Prevention and Control of Pollution) Act, 1981 in Public Service Delivery Guarantee Act Details
262

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has a combined application form under Water Act /Air Act/ Hazardous waste rules. There is a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
264

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has implemented an online system where third party can verify approval certificates in public domain Details
266

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has notified timeline for Application of Authorization under the Hazardous and Other Wastes (Management and Trans boundary Movement) Rules, 2016 Details
269

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has implemented an online system where third party can verify approval certificates in public domain Details
272

Design and implement a system that allows online application submission, payment, tracking and monitoring without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has a combined application form under Water Act /Air Act/ Hazardous waste rules. There is a system in place to support users/applicants to submit online application, make payment, and allow users to track & monitor the application status with zero physical touch point Details
274

Allow third parties to easily verify the approval certificates in the public domain

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has implemented an online system where third party can verify approval certificates in public domain Details
276

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Madhya Pradesh Pollution Control Board (MP PCB) has notified timeline for Application of Consent to Operate under the Air (Prevention and Control of Pollution) Act, 1981 in Public Service Delivery Guarantee Act Details
278

Ensure that the system allows users to download the final signed approval certificate from the online portal

Approved View File View URL Ensure that the system allows users to download the final signed approval certificate from the online portal Details
284

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File MP Electricity Regulatory Connection (MPERC) publishes the tariff details which are available on the website of all three Discoms i.e Central, West and East Details
286

Allow third party inspection of internal installations and ensure that majority of establishments avail this provision

Approved View File Department has exempted inspections for upto 33 kv connections and every electrical installation of 33kv (or less) shall be selfcertified Details
287

Ensure that users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas of State and ensure these charges (demand note) is generated through the online system

Approved View File Users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas and is calculated online. The details of the estimate can be found on MPERC guidelines available at discomwebsite also and user can calculate his estimate before applying for the connection Details
291

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application for granting `Right of Way` (RoW) permission

Approved View File View URL Department has defined clear timelines and mandated through the Public Service Delivery Guarantee Act, for approval of complete application for granting Right of Way (RoW) permission Details
294

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has defined clear timelines mandated through the Public Service Delivery Guarantee Act for providing certification of Electrical Installation by Chief Electrical Inspector Details
296

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File A system is in place for all three discoms where users can download the final signed approval certificate from the online portal. Details
297

Allow third parties to easily verify the approval certificates in the public domain

Approved View File Department has made available all certificates in public domain which can be accessed by any stakeholders without any login Details
370

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has mandated timelines for Retail Drug License (Pharmacy) and renewal under Public Service Guarantee Act (or equivalent Act) Details
372

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL Department Of Food & Drugs has enabled user to download the final signed approval certificate from the online portal Details
378

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has mandated timelines for Wholesale drug license under Public Service Guarantee Act Details
380

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL Department Of Food & Drugs has enabled users to download the final signed approval certificate from the online portal Details
382

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has mandated timelines for Granting and renewal of Drug Manufacturing License and timelines are notified under Public Service Delivery Guarantee Act Details
384

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL The system allows user to download the final signed approval certificate from the online portal Details
389

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL Department portal allows the user to download the final signed approval certificate Details
392

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Department has defined clear timelines for the following and mandated the same under the Public Service Delivery Guarantee Act- Licenses as Manufacturer & renewal Licenses as Dealer & renewal Licenses as Repairer & renewal Registration as Packager (it is lifetime, renewal not required) Details
394

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL The user can download the final signed approval certificate from the online portal for the following licenses / registration- Licenses as Manufacturer Licenses as Dealer Licenses as Repairer Registration as Packager Details
399

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL The system allows user to download the final signed approval certificate from the online portal. Details
402

Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application

Approved View File View URL Clear timelines have been mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for approval of complete application Details
404

Ensure that the system allows user to download the final signed approval certificate from the online portal.

Approved View File View URL System allows user to download the final signed approval certificate from the online portal Details
408

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Controller Weights and Measures has issued order that mandates submission of inspection report within 48 hours to the Department through online system Details
411

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL Department has issued an order which mandates that same inspector will not inspect the same establishment twice consecutively Details

Back