header Image
MAHARASHTRA
Implementation Percentage
92.86%

YES
312
NO
24
N/A
4
Reform Details
Reform NoReform AreaStatusDocument AttachedURLRemarksgood PracticeView
1

Develop and make publicly available a comprehensive checklist of all required pre-establishment No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for setting up of a business

Approved View File View URL The highlighted area shows that there is no other approval required by the investor. Details
2

Develop and make publicly available a comprehensive checklist of all required pre-operation No Objection Certificates (NOCs), licenses, registrations and other mandatory State approvals required for starting business operations

Approved View File View URL MAITRI, the single window portal, has a tab called Available Services which provides a comprehensive list of all the approvals that are required for an investor to commence the functioning of a business or industrial unit. If the user selects Pre-operation - Before Commencement of Operations as the criteria for the dropdown, he gets a comprehensive list of approvals required for making his business unit functional. Details
3

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to establishing her/his business/industrial unit

Approved View File View URL MAITRI, the single window portal, has a tab called List of Approvals which has all the relevant filters incorporated, where the user is expected to mention his requirements based on which the list of required approvals change. Location of the land is a mandatory selection for all the filter combinations and the list of required approvals would change based on the selection. The stage of the proof is mentioned as Pre-Establishment. Details
4

Design and implement an online system where an investor can key in specific details (such as type of industry, number of employees, location etc.) and obtain information regarding all State approvals applicable to starting operations of her/his business/industrial unit

Approved View File View URL MAITRI, the single window portal, has a tab called List of Approvals which has all the relevant filters incorporated, where the user is expected to mention his requirements based on which the list of required approvals change. Location of the land is a mandatory selection for all the filter combinations and the list of required approvals would change based on the selection. The stage of the proof is mentioned as Pre-Operation to convey that those proofs are required in the Pre-Operation Stage. Details
5

Establish a centralized help line number to facilitate queries regarding the application and approval process

Approved View File View URL The screenshot below shows the centralized investor helpline number which is currently active and is being flashed on the MAITRI - Single Window Portal for the State of Maharashtra. For queries related to permission and approvals, the helpline no. is 1860-233-2028 from 10:00 am to 6:00 pm Mondays to Fridays and odd Saturdays. Details
6

Implement a system whereby business entities are issued a single ID for all State taxes (VAT and CST, and PT, Entertainment Tax, Entry Tax and Luxury Tax where applicable)

Approved View File View URL The department of Sales Tax has implemented a system whereby business entities are issued a single ID for the following taxes: VAT, CST, PT, Entry Tax and Luxury Tax. Details
7

Mandate that the final VAT registration certification will be issued within at most one (1) working day from the date of submission of application form

Approved View File View URL The URL can be opened on Internet Explorer only. It shows a - yet to updated - remark on Google Chrome. Details
8

Mandate that the final professional tax registration certification (where applicable) will be issued within at most one (1) working day from the date of submission of application form

Approved View File View URL The department of Sales Tax has made a provision to mandate that the final professional tax registration certification (where applicable) will be issued within at most one (1) working day from the date of submission of application form. The details can be found in Page 7 of the following document: Details
9

Enact a legislation (e.g. Right to Services Act) to mandate time-bound delivery of services to Industries/ Businesses

Approved View File View URL Government of Maharashtra conceptualized and introduced the Aaple Sarkar Portal in 2015, with an objective to provide a single touch point for various Government to Business (G2B) and Government to Citizen (G2C) services.Currently, about 224 services offered by various Departments have been notified under the Right to Services Act, 2015. Out of these services the State has so far integrated about 155 services with the Aaple Sarkar portal. Details
10

Ensure that the time-bound service delivery legislation defines punitive provisions that deter officials from not complying with the defined timelines for services being provided to Industries/ Businesses

Approved View File View URL Section 10: If the First Appellate Authority is of the opinion that the Designated Officer has failed to provide public service without sufficient and reasonable cause, then he shall impose a penalty which shall not be less than rupees five hundred, but which may extend to rupees five thousand, or of such amount as may be revised by the State Government, from time to time, by notification in the Official Gazette. Details
11

Ensure that the time-bound service delivery legislation defines clear procedures for applicants to submit grievances relating to non-compliance with the defined timelines

Approved View File Maharashtra Right to Public Services Act, 2015 sections 8, 9, 10,11 and 12 define clear procedures for applicants to submit grievances relating to non-compliance with the defined timelines Details
12

Mandate and make arrangements to publish draft business regulation online and invite public comments/ feedback on the same prior to enactment

Approved View File Recognizing the value of stakeholder opinion, in order to augment the transparency and efficiency in conceptualizing business regulations, the State has introduced a circular mandating government departments to publish the draft business regulations online, and invite public comments. Details
13

Mandate and make arrangements to publish the comments/feedback received on the draft business regulation and how they were addressed in the final regulation

Approved View File View URL The State has mandated all departments publishing the comments/feedback received on the draft business regulation and how they were addressed in the final regulation through the circular attached. The screenshots show that: The Draft Enforcement Policy was published online to invite public comments and feedback. The Minutes of Meeting shows the comments and feedback that was provided to the department. The amended Policy which includes the comments and feedback. Details
14

Establish a dedicated physical body/ bureau that functions as the sole point of contact for the purpose of setting up a business

Approved View File View URL Maharashtra Industry, Trade and Investor Facilitation Cell (MAITRI) was set up on 27th February 2014. Nodal Officers from various departments have been appointed for the MAITRI to facilitate investment proposals. The Single Window Scheme will be implemented through the MAITRI platform. Address: C/O Maharashtra State Small Scale Industries Development Corporation (MSSIDC), Krupanidhi Building, 9, Walchand Hirachand Marg, Ballard Estate, Mumbai - 400038 Details
15

Ensure that the single window body/ bureau has been set up through a legislation/State notification

Approved View File View URL The Government Resolution dated 11th February 2016 (MIM 2015/PK 105 / Udyog 8), has empowered MAITRI as state Single Window for all investment & Industry related information and services. Details
16

Delegate the required decision-making powers to the single window body/ bureau to grant all required approvals/ clearances

Approved View File View URL As per the Maharashtra Single Window GR (MIM 2015/PK 105 / Udyog8), MAITRI has been delegated decision making powers for grant of about 44 approvals across 16 departments required for setting up a business in the state. About 16 officers of concerned department work as a nodal officer in MAITRI. Details
17

Delegate senior level officials with appropriate powers from various Departments through secondment/ deputation to the single window body/ bureau

Approved View File As per the Maharashtra Single Window GR (MIM 2015/PK 105 / Udyog8), Government has delegated sixteen senior level officials from respective departments as a Nodal officers at MAITRI Details
18

Ensure that the single window body/ bureau has a physical office to house relevant officials of various Departments for providing approvals/ clearances

Approved View File There is a physical office of Single Window System MAITRI, at 1st Floor, Krupanidhi Building, Ballard Estate. A dedicated team of 41 government officers from various Departments under the Directorate of Industries are based out of the same office and are available for consultation and assistance as per the Single Window GR. The list of the designation of officers and the physical office address and the GR are provided in the proof. Details
19

Ensure that the single window provides clear timelines for issuing all approvals

Approved View File View URL The timelines for the services provided under RTS are provided on the link above under the heads of Approvals for Mega Projects, Pre-establishment Approvals and Pre -operations Approvals as shown in the attached document. Details
20

Ensure that the single window provides clear timelines for addressing investor grievances

Approved View File View URL The grievance redressal timeline is of 30 days. Details
21

Implement an online Common Application Form (CAF) for all required clearances/approvals in the single window

Approved View File View URL Currently investor can apply for close to 19 services through MAITRI Single Window by filling a Common application form which is easily accessible on MAITRI website Details
22

Design and implement an online single window system with functionality for online application, payment and approvals

Approved View File View URL MAITRI - Single Window platform facilitates investors to apply for multiple services online by filing a Common Application Form. Investor can make an Online payment, submit documents through the portal and can track the status of his application. Once approved, he can also download the registration certificate online. Details
23

Ensure 'Consent to establish (under Water Act & Air Act)’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
24

Ensure 'Consent to operate (under Water Act & Air Act)’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
25

Ensure 'Authorization under Hazardous Waste Rules’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
26

Ensure that incentives under Industrial Policy is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status and approvals

Approved View File View URL Details
27

Ensure ‘Registration under Shops and Establishments Act’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
28

Ensure ‘Permission for engaging contractor for labour’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
29

Ensure 'Factories license’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
30

Ensure ‘Factory building plan approval’ (under the Factories Act, 1948) is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
31

Ensure ‘Registration under Boiler Act’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
32

Ensure ‘Change of land use’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
34

Ensure ‘NOC from Fire Department’ is provided as a service through the online single window system in a manner that allows online application, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
35

Ensure renewal of 'Consent to operate (under Water Act & Air Act)’ is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
36

Ensure renewal under ‘Shops and Establishments Act’ is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
37

Ensure renewal under 'Factories license’ is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File Details
38

Ensure renewal under ‘Registration under Boiler Act’ is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals and issuance of the certificate(s)

Approved View File View URL Details
39

Ensure electricity connection is provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals

Approved View File View URL Details
40

Ensure water connection provided as a service through the online single window system in a manner that allows online filing, payments, tracking of status, approvals

Approved View File View URL Details
41

Design and implement an online system for filing of EM Part I and Part II under The Micro, Small and Medium Enterprises Development Act, 2006

Approved View File View URL Also, as seen in the screenshots below, filing of EM Part I and Part II is provided as a service through a single window system. Log into the website: https://maitri.mahaonline.gov.in/Login/Login Details
42

Ensure information on land banks for industrial use are made publicly available online

Approved View File View URL For Non MIDC- Survey numbers of the lands earmarked for Industrial use in all regional plans across the state have been published by the Urban development department at the URL provided in the document. Details
43

Earmark industrial land parcels with specific criteria (e.g. type of industries, pollution levels etc.) for industries that can be setup on such land

Approved View File View URL The Maharashtra Industrial Development Corporation allows any type of industry to be set up in any industrial area across the State, with an exception of a few obnoxious industries that are prohibited anywhere within MIDC areas. Details
44

Design and implement a GIS system providing details about the land earmarked for industrial use

Approved View File View URL Details
45

Ensure that the GIS system provides details about available infrastructure such as road, water etc.

Approved View File View URL Details
47

Define clear timelines defined for processing of application for land allotment (from the date of application)

Approved View File A timeline of 21 days is mentioned in the Citizen Charter. Details
48

Define clear timelines for processing of application for conversion of land/ change in land use (from the date of application) for land outside of industrial parks/IDC areas.

Approved View File View URL Refer to Point 7 on Page 3 of the attached circular which defines the clear timelines of processing the application as 241 days. The said Government Resolution is available on Government of Maharashtras website and its Unique Code number is 201605021216263225. Details
49

Make available a model sale deed format for property registration on the department’s website

Approved View File View URL Details
50

Ensure that users can collect eStamps at the time of property registration at the sub-registrar’s office (i.e. no need of going to the bank to collect the challan/e-stamp)

Approved View File View URL As seen in the screenshots below, a user can log into https://gras.mahakosh.gov.in/igr/ for e-payment of stamp duty or e-stamps. The challan can be obtained from the challan history tab as seen in screenshot 3. Hence, there is no need to physically go to the bank to obtain the same. Details
51

Digitize land records at sub-registrar's office and make it available on an online system

Approved View File View URL Go to the URL https://esearchigr.maharashtra.gov.in As seen in the screenshot, the year is 2005, the village is Koregaon and property no is 1238. When a person clicks on search the digital land records is available. Details
52

Digitize land records at land records office and make it available on an online system

Approved View File View URL Land records of last 30 years have been digitized and made available online. iSARITA (Integrated Stamp and Registration Information Technology Application ) has been launched since July 2012. It is the centralized computerized system for registration of documents which has enabled easier, faster and transparent registration process in an integrated manner. Step 1: Go to the website Step 2: Select 7/12 Step 3: Enter the required details to access the records Details
53

Digitize land records at local municipality office and make it available on an online system

Approved View File Land records have been digitized at local municipality offices and are available on the online system Details
57

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Go to www.igrmaharashtra.gov.in under Citizens Area go to FAQs, Registration of Documents. Click on Preparation for Registration. Click on General Information. Click on Q3 and Q5 as highlighted in the screenshot for procedure and comprehensive list of documents required for property registration respectively. Details
58

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Please refer to Page No.: 2, point 5 of the Citizen Charter document mentioned below: https://igrmahhelpline.gov.in/igr_user/cms_upload/Edocument/11553286831409726206.pdf Details
59

Design and implement a system that allows online application and payment without the need for a physical touch point for document submission and verification

Approved View File View URL Details
60

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Log-on to https://efilingigr.maharashtra.gov.in/ereg/ Enter Token Number: 13041600407 Password: Tushar@216 As seen in the screenshot below, click on View Status. A message saying document is registered appears on the screen. Details
61

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Log-on to https://efilingigr.maharashtra.gov.in/ereg/ Enter Token Number: 13041600407 Password: Tushar@216 As seen in the screenshot below, click on View Status. A message saying document is registered appears on the screen. Details
62

Enact a comprehensive formal building code applicable to the entire State

Approved View File View URL The Urban Development Department has developed a standardised Development control and promotion Regulations for All Municipal councils and Nagar panchayats across Maharashtra : https://www.maharashtra.gov.in/site/upload/WhatsNew/ABCDCR_03122013_1.pdf and for regional plans in Maharashtra is https://www.maharashtra.gov.in/site/upload/WhatsNew/ABCDCR_RP_03122013.pdf Relevant provisions of the National Building Code are provided at https://urban.maharashtra.gov.in/default.aspx Details
63

Ensure that the building code/building bye-laws include provisions for risk-based classification of buildings.

Approved View File View URL MIDC vide circular dated: 29.06.2016 (No. MIDC/CP/C01690/2016) has defined Risk based criteria for Buildings within MIDC area for issuance of construction permit and Building completion cum occupancy certificates. Details
64

Ensure that the building code/building bye-laws includes accreditation programs and clear responsibilities and liabilities for professionals including architects and engineers engaged in the construction process.

Approved View File DCRs include accredition programmes and clear responsibilities and liabilities for professionals including architects and engineers engaged in the construction process. The screenshots are attached. Details
66

Mandate that a single, joint site inspection will be carried out by various government authorities responsible for granting construction permits at all ULBs and IDCs.

Approved View File View URL Urban Development Department, Government of Maharashtra vide circular dated 23.03.2016 (TPS-1815/PK216(Part 2)/15/NV-13) has mandated a Single joint inspection while granting the construction permit in the ULB area. The English Translation of the attached circular is provided. Details
67

Develop legally valid master plans/zonal plans/land use plans for all urban areas (ULBs)

Approved View File View URL Government of Maharashtra has developed legally valid master plans for entire state which are available at: http://dtp.maharashtra.gov.in/ Details
68

Make the master plans/zonal plans/land use plans for all ULBs online for easy information availability to assist applicants in developing building plans

Approved View File View URL Government of Maharashtra has published legally valid master plans online for the entire state which can be accessed at : http://dtp.maharashtra.gov.in/ Details
69

Define mandatory qualifications for architects, structural engineers and contractors

Approved View File View URL MIDC Development Control Regulations 2009 (Part 1: Section 15.2, 15.3 and 15.4). UDD: The Development Control regulations 2013 (Appendix C): https://www.maharashtra.gov.in/site/upload/WhatsNew/ABCDCR_RP_03122013.pdf MCGM: The DCR 1991 (Section 5.1): http://www.mcgm.gov.in/irj/portal/anonymous/qldecreg Details
70

Implement a system to allow approval based on third party certification (during construction and/or completion stage, as applicable) of structural design and architectural drawings by authorized structural engineers and architects respectively across all ULBs and IDCs

Approved View File View URL MIDC vide circular dated 24/02/2016, (No. MIDC/CP/A60356/2016). For UDs, please refer to the DCR 1991 at http://www.mcgm.gov.in/irj/portal/anonymous/qldecreg Details
71

Allow authorized architects to issue the completion certificate at all ULBs and IDCs, instead of requiring a separate completion certificate to be issued

Approved View File View URL The Development Control Regulations 1991(Section 6.6), allow third parties to issue the completion certificate instead of requiring a separate completion certificate Post issuance of the certificate, a randomised inspection is conducted. Details
73

Publish online detailed information on replanting requirements for plots with varying tree populations.

Approved View File View URL Refer to page 3 of the Maharashtra felling of Trees (Regulation) Act, 1964, where the replanting requirement is mentioned. It is also available online at the mentioned URL. Details
75

Establish a dedicated conflict resolution mechanism for land and construction permits.

Approved View File View URL As per the Maharashtra Regional and Town Planning Act 1966, Section 47, there is a provision for an applicant to appeal against conflicts related to land and construction permit where he can appeal within 45 days of the date of communication of the order. The appeal lies with the Director Town Planning in case of B, C Class councils and Nagar panchayats, State Government in case of A and all other municipal councils and Municipal corporations and for Regional Plan areas with board of appeal. Details
76

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL For ULBs, Development Control Regulations 1991 - Section 5: Procedure for obtaining Development Permission and Commencement Certificate specify the list of documents required. Please refer to the DCR 1991 available at: http://www.mcgm.gov.in/irj/portal/anonymous/qldecreg Details
77

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL MIDC has prescribed a timeline of 15 days for issuance of Construction Permit. This has been mentioned in the Citizen Charter on page 17. ULBs: As per the Development Control Regulations 1991, a timeline of 60 days has been prescribed for issuance of Construction permit in Regional Plan and Development Plan. http://www.mcgm.gov.in/irj/portal/anonymous/qldecreg Details
79

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File MIDC has made the provision for users to download the final signed approval certificate from the online portal at http://www.midcindia.org/ by logging in and checking the Dashboard. Details
81

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Please see the information under the heads Documents Required and Method of Application Details
82

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL For Forest Department : A copy of the act is attached for your reference. Refer to the highlighted section 1 C of the Maharashtra Felling of Trees (Regulation) Act, 1965. The clear timeline of 60 days is specified. For MIDC: A timeline of 60 days is mentioned in circular attached below. Details
83

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL For Forest Department: Currently no payment is required to be made for NOC for tree felling. The link for tracking the application is http://117.239.200.166/maharashtraforest/public_rts_track.php Details
84

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Click on Application Tracker Click on Download/Print 2015/TREENTRIBAL565/MFD16959 Details
85

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Click on Application Tracker Click on Download/Print 2015/TREENTRIBAL565/MFD16959 Details
86

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The procedure and list of documents required for Issuance of Provisional Fire No - Objection Certificate is available at the website mentioned. Details
87

Define clear timelines mandated through legislation for approval of application

Approved View File View URL A timeline of 15 days is mentioned in the Citizen Charter on page 25. Please refer to the attached Citizen Charter. The citizen charter is available at the following website: http://www.midcindia.org/citizen-charter Details
88

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
89

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File The screenshots below show that users can download the final signed approval certificate from the online portal. Details
90

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
91

Enact a list of green industries applicable for the State.

Approved View File Evidence for Categorization of Industries as well as List of Green Industries attached. Details
93

Allow for auto-renewal of Consent to Establish (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View File Details
94

Allow for auto-renewal of Consent to Operate (under Water Act, 1974 and Air Act, 1981) based on self-certification/third party certification

Approved View File Details
95

Issue Consent to Operate licences that are valid for a minimum period of 5 years or more

Approved View File Details
96

Issue Consent to Establish licences that are valid for a minimum period of 5 years or more

Approved View File As seen in the attached note in the Tip, that CTE can be obtained for 5, 10 or 15 years. Details
97

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File http://mpcb.gov.in/consentmgt/consentinfo.php ; http://mpcb.gov.in/consentmgt/waterairact.php Details
98

Define clear timelines mandated through legislation for approval of complete application

Approved View File screenshot attached Details
99

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
100

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
101

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
102

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File Details
103

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
104

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
105

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
106

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
107

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Procedure: http://www.mpcb.gov.in/consentmgt/procedure.php As seen in the application form there is a common consent for Air, Water Act and Hazardous Waste (Management and Handling) Rules, 1989. The application form is available at http://www.mpcb.gov.in/images/Combied-consentformNew_31012012.pdf Details
108

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
109

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
110

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
111

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL He/she can search for Consent to Establish certificate by name of industry or by EIC number. This certificate is verifiable in the public domain by the application number which is a 12 digit unique number. As seen in the application form there is a common consent for Air, Water Act and Hazardous Waste (Management and Handling) Rules, 1989. The application form is available at http://www.mpcb.gov.in/images/Combied-consentformNew_31012012.pdf Details
112

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Procedure: http://www.mpcb.gov.in/consentmgt/procedure.php Details
113

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
114

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
115

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File Details
116

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
117

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Procedure: http://www.mpcb.gov.in/consentmgt/procedure.php Details
118

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
119

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Once the user has signed into the MPCB portal at http://www.ecmpcb.in/ Click on the Applications tab. Click on the first tab Application for consent. Choose the type of application. As seen in point 2, page 2 of the attached document, payment is done using RTGS/NEFT. The application can be tracked online. The consent certificate can be downloaded Details
120

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File As seen on page 4 of the attached document, it can be seen in the screenshot that the final consent certificate can be downloaded by clicking on the Download certificate. Please refer to the last screenshot for a copy of the final consent certificate. Details
121

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
122

Mandate the submission of a single integrated return under all Labour Laws

Approved View File View URL Please refer to Page No. 1 to 6 of the Government Resolution (attached) for details of the provision, and Page No. 12 for the consolidated annual return form to be submitted Details
123

Introduce a provision for self-certification/third party certification of boilers

Approved View File View URL Details
124

Introduce a provision for issuing Factory License and all subsequent renewals with validity of 10 years or more

Approved View File The State has made a provision to issue Factories License and all subsequent renewals with validity up to 10 years through the Maharashtra Factories Rules, 1963. The relevant information can be found on Page 93 of the Maharashtra Factories Rules (Revised). Details
125

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The procedure and document checklist for obtaining Factory license are available on the website. The process for obtaining Factory License is online, however the submission of Form 1 in the physical form is mandatory. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. Details
126

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The English translation of the Marathi version of the document which has clear timelines mandated through the legislation for approval of complete application for license under the Factories Act is attached. Details
127

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The process for obtaining Factory License is online, however the submission of Form 1 in the physical form is mandatory. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. Details
128

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
129

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
130

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The process for obtaining Factory Plan Approval is online, however the submission of the plan layout in the physical form is mandatory as it a huge file to be uploaded. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. Details
131

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The English translation the Marathi version of the document which shows clear timelines mandated through legislation for approval of complete application. Details
132

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The process for obtaining Factory Plan Approval is online, however the submission of the plan layout in the physical form is mandatory as it a huge file to be uploaded. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. Details
133

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal accessed at https://lms.mahaonline.gov.in/ Details
134

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
135

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The process for Registration of Boiler is online, however the submission of certain documents with higher memory size is difficult. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. This is shown in the proof for Recommendation No. 137 Details
136

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The department has defined clear timelines mandated through legislation for approval of complete application. Details
137

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL The process for Registration of Boiler is online, however the submission of original makers papers along with the approved drawing is mandatory as the provision of uploading the documents with higher memory size is difficult. Thus, the provision for submitting these documents is made through postal delivery. A courier tracking facility is provided, where the applicant is able to upload the details of postage service to track the physical documents online. Details
138

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal is shown in the attached document. Details
139

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
140

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
141

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL An English translation of the clear timelines mandated through legislation for approval of complete application for license under the Contracts Labour (Regulation and Abolition) Act Details
142

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
143

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal accessed at https://lms.mahaonline.gov.in/ Details
144

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
145

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
146

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
147

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
148

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal accessed at https://lms.mahaonline.gov.in/ Details
149

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
150

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
151

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
152

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
153

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File The attached screenshot shows that the user can download the certificate from his/her account after the application is processed Details
154

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Enter Labour Department in the first two tabs and then enter the Principal Employer Registration in the third tab. Enter the ID in the last tab to view to the certificate. The screenshot shows that the third party can verify the certificate online. A sample verification is also shown. Details
155

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
156

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The clear timelines mandated through legislation for approval of complete application can be found on Page 12. Details
157

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
158

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal accessed at https://lms.mahaonline.gov.in/. The attached screenshot shows the dashboard, where users can download the digitally signed certificates. Details
159

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
160

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The attached document shows that the checklist as well as the procedure is available on the website. Details
161

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The clear timelines mandated through legislation for approval of complete application for renewal of license under the Factories Act is available on the website. Details
162

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
163

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL The provision to download the final signed approval certificate from the online portal accessed at https://lms.mahaonline.gov.in/ The attached screenshot show the dashboard, where users can download the digitally signed certificates Details
164

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
165

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Details
166

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The department has defined clear timelines mandated through legislation for approval of complete application. Details
167

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
170

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
171

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL An English translation of the highlighted area in the circular below specifies a timeline of 7 days. Details
172

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
173

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File The attached screenshot shows that the user can download the certificate from his/her account after the application is processed. Details
174

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Enter Labour Department in the first two tabs and then enter the Contract Labour Renewal in the third tab. Enter the ID in the last tab to view to the certificate. The screenshot shows that the third party can verify the certificate online. A sample verification is shown. Details
175

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The link provides the detailed procedure covering all applicable steps, from application submission to application approval as well as the document checklist required for application. The same is reflected in the screenshots attached. Details
176

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
177

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File Details
178

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File The attached screenshot shows that the user can download the certificate from his/her account after the application is processed. Details
179

Ensure that the DisComm uses automated tools to monitor outages

Approved View File Under RAPDRP Part-A project, SCADA / DMS is implemented in MSEDCL at 8 towns which are Amravati, Solapur, Sangli, Nashik, Malegaon, Kolhapur, Pune, Greater Mumbai Details
180

Ensure that the DisComm uses automated tools for service restoration

Approved View File Under RAPDRP Part-A project, SCADA / DMS is implemented in MSEDCL at 8 towns which are Amravati, Solapur, Sangli, Nashik, Malegaon, Kolhapur, Pune, Greater Mumbai Details
181

Ensure that the regulator monitors reliability of supply and published information online.

Approved View File View URL The data of reliability indices is also shared with REC for availability on Urja App launched by Ministry of power Details
182

Enact measures to ensure that the utility compensates customers for outages that go over a certain cap, or that a fine is imposed by the regulator if the outage cap is exceeded

Approved View URL MSEDCL through Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2005 has published necessary guidelines to compensate customers for outages that go over a certain cap. Details
183

Ensure that information on effective tariffs are available online, and that customers are notified of a change in tariff ahead of the billing cycle

Approved View File View URL Message is displayed on every consumers electricity bill showing date of tariff applicability. Details
184

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL MSEDCL has made available soft copies of consumer bills (web bill) on its website, where any third party can view the bill details using consumer number and Billing Unit Number Details
185

Implement an online application for obtaining electricity connection

Approved View File MSEDCL and other utilities in Maharashtra (Tata Power, BEST, Reliance) have implemented an online application system for obtaining electricity connection. MSEDCL has issued commercial circular No 245 for provision of online services for obtaining new electricity connection. Details
186

Ensure that users are provided a fixed cost estimate based on the load required for obtaining electricity connection in industrial area

 

Approved View File View URL MSEDCL along with BEST, Tata Power and Reliance have introduced a mechanism for Online application, document upload and onetime payment for new electricity connection above 100 K W. This is as per the fixed cost estimates based on load requirements introduced by Maharashtra Electricity Regulatory Commission in 2015. Details
187

Reduce the number of documents required for obtaining the electricity connection to only 2, namely proof of ownership/occupancy and authorization document (in case of firm/company)

Approved View File View URL As per the departmental circular no. 245, MSEDCL has reduce the number of documents required for obtaining the electricity connection to only 2 : 1. Ownership proof 2. Industrial Registration / DIC certificate. Refer the departmental circular no. 245, attached herewith. Details
188

Stipulate that the charged electricity connection is provided within 15 days from the date of application

Approved View File View URL As per the commercial circular No. 240 - Revised guidelines regarding standard of performance, time required for grant of charged electricity connection is reduced from existing 30 days to 15 days from the date of application Details
189

Allow third party inspection of internal installations

Approved View File MSEDCL allows third party inspection of internal installations prior to connections. Please find below the sample test report ( D1 form ) conducted by a third party. An English Translation of that document is given below for reference. Details
190

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The procedure is available at the URL mentioned above. The list of required documents for obtaining Water Connection is available in the document attached. Details
191

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL A timeline of 7 days is mentioned in the Citizen Charter, which is available at the following website: http://www.midcindia.org/citizen-charter Details
192

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
193

Design and implement a system for Value Added Tax (VAT) to be filed online

Approved View File View URL The provision for e-filing of VAT returns along with all the required information (including the circular pertaining to e-returns, instructions and procedure for filing returns and details on uploading of annexures) is available in the attached document and circular. Details
194

Design and implement a system for Central Sales Tax (CST) to be filed online

Approved View File View URL The provision for e-filing of CST returns along with all the required information (including the circular pertaining to e-returns, instructions and procedure for filing returns and details on uploading of annexes) is available in the attached document and circular. Details
195

Design and implement a system for Professional Tax to be filed online

Approved View File View URL The provision for e-filing of PT returns along with all the required information (including the circular pertaining to e-returns, instructions and procedure for filing returns and details on uploading of annexures) is available in the document and circular that is attached. Details
196

Design and implement a system for Luxury Tax to be filed online

Approved View File View URL The provision for e-filing of Luxury Tax returns along with all the required information (including the circular pertaining to e-returns, instructions and procedure for filing returns and details on uploading of annexures) is available in the screenshot and circular that is attached. Details
198

Design and implement a system for Entertainment Tax to be filed online

Approved View File View URL Details
199

Design and implement a system for Value Added Tax (VAT) to be paid online

Approved View File View URL Details
200

Design and implement a system for Central Sales Tax (CST) to be paid online

Approved View File View URL Details
201

Design and implement a system for Professional Tax to be paid online

Approved View File View URL Details
202

Design and implement a system for Luxury Tax to be paid online

Approved View File View URL Details
203

Design and implement a system for Entry Tax to be paid online

Approved View File View URL Details
204

Design and implement a system for Entertainment Tax to be paid online

Approved View File View URL Select Revenue Department under Department, Entertainment Tax under Payment Type, Select the Office Name and then e-payment to avail the online payment facilities for Entertainment Tax. The website for the same is: https://gras.mahakosh.gov.in/echallan/challan/views/frmguestechallan_entry.php Details
206

Establish a helpline providing basic services assisting users in preparing and filing returns

Approved View File View URL The department of Sales Tax has established helplines for providing basic services assisting users in preparing and filing returns. The helpline numbers are available on the website. Details
207

Mandate that the VAT refund payment should directly be paid into organization's account within 60 days

Approved View File View URL The Department of Sales Tax has mandated that the VAT refund payment should directly be paid into organizations account within 60 days through circular 5T of 2016. Details
208

Implement a system for risk based audit related to tax compliance

Approved View File View URL Details
209

Introduce a system for advance tax ruling for State level taxes on the lines of Income Tax Act

Approved View File View URL The Sales Tax Department has constituted Advance Ruling Authority vide notification Maharashtra Act No. XV of 2016 dated 26 April 2016. Chapter VI of the act is related to Amendments to the Maharashtra Value Added Tax Act, 2002. At point no. 9, the section 10 of Mah. IX, 2005 is amended to insert the words and figures and Advance Ruling Authority constituted under section 55. Details
210

Publish forms relating to information captured at check posts been made available online

Approved View File The Commissioner of Sales Tax has elaborated that the State does not have any Border Check Posts for collecting Taxes. The movement of goods is verified on the basis of documentary evidences submitted online by the dealer such as dispatch proofs, transport receipts, delivery challans, etc. The receipts are cross tallied with the invoices submitted by the dealer for authentication. Details
211

Phased out static check posts and implement random checking by mobile squads

Approved View File The Sales Tax department does not have any border check posts or mobile squads to monitor the movement of goods. The movement of goods is verified on the basis of documentary evidences submitted online by the dealer such as dispatch proofs, transport receipts, delivery challans, etc. The receipts are cross tallied with the invoices submitted by the dealer for authentication. Details
212

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive list of all documents and information on the procedure is provided are available on the website. Details
213

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
214

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
215

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
216

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
217

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL A comprehensive list of all documents that need to be provided and information on the procedure for CST is available on the website. Details
218

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
219

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
220

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
221

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
222

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The information on the procedure and the checklist requirements are made available on the website as shown in the attached document. Details
223

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL Details
224

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
225

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
226

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
227

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL The information on the procedure and the required checklist for Entry tax are available on the website as shown in the attached document. Details
228

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The clear timelines for approval of complete application have been mandated through Circular 18T of 2016. As per the circular, there is a Single Application for VAT, CST, PT, Entry Tax and Luxury Tax and the registration certificate under all acts (including registration for Entry Tax) is provided within 1 working day Details
229

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
230

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
231

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
232

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Refer to the URL mentioned in the URL section and kindly refer to Required documents for the comprehensive list of documents required for Registration of Entertainment tax by Local Cable Operator. Details
233

Define clear timelines mandated through legislation for approval of complete application

Approved View File As seen on the attached document on page 2, its takes 30 days for Registration of Entertainment tax (for Multi-System Operator and Local Cable Operator). Details
234

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
235

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File After the completing the application for Registration of Entertainment Tax at https://aaplesarkar.mahaonline.gov.in/en , the certificate can be downloaded as shown in the second screenshot after logging into the Aaple Sarkar portal. Details
236

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
237

Ensure information on the procedure and a comprehensive list of all documents that need to be provided are available on the web site

Approved View File View URL Information on the procedure and the required checklist is available at the website as shown in the attached document. Details
238

Define clear timelines mandated through legislation for approval of complete application

Approved View File View URL The clear timelines for approval of complete application have been mandated through Circular 18T of 2016. As per the circular, there is a Single Application for VAT, CST, PT, Entry Tax and Luxury Tax and the registration certificate under all acts (including registration for Luxury Tax) is provided within 1 working day. Details
239

Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification

Approved View File View URL Details
240

Ensure that the system allows users to download the final signed approval certificate from the online portal.

Approved View File View URL Details
241

Allow third parties to easily verify approval certificates in the public domain

Approved View File View URL Details
242

Differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all labour laws

Approved View File The Department of Labour has differentiate compliance inspection requirements based on risk profile (such as High, Medium and Low risk) of industries under all labour laws. The relevant sections are highlighted in the circular attached. Details
243

Exempt low risk industries with a history of satisfactory compliance from labour compliance inspections, or allow self-certification in lieu of conducting physical inspections under all Labour laws

Approved View File In its Randomization Inspection Scheme, the Department of Labour has made the provision to exempt low risk industries with a history of satisfactory compliance from labour compliance inspections, in lieu of conducting physical inspections under all Labour laws. Details
244

Differentiate compliance inspection requirements based on industry pollution categorization such as Red, Amber, and Green under all environment/pollution laws

Approved View File Details
245

Exempt Green industries with a history of satisfactory compliance from environmental compliance inspection, or allow self-certification (in lieu of conducting physical inspections)

Approved View File Details
247

Allow for synchronized/joint- inspection under all of the following acts
I. Inspection under The Equal Remuneration Act, 1976
II. Inspection under The Factories Act, 1948
III. Inspection under The Maternity Benefit Act, 1961
IV. Inspection under The Minimum Wages Act, 1948
V. Inspection under The Shops and Establishments Act (as applicable)
VI. Inspection under The Labour Welfare Fund Act (as applicable)
VII. Inspection under The Payment of Bonus Act, 1965
VIII. Inspection under The Payment of Wages Act, 1936
IX. Inspection under The Payment of Gratuity Act, 1972
X. Inspection under The Contract Labour (Regulation and Abolition) Act, 1970

Approved View File The department has made the provision for synchronized inspections under the aforementioned labour acts through its Randomized Inspection Scheme. The relevant sections from the circular have been highlighted in the attached document. Details
248

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File The Maharashtra Sales Tax Department does not conduct any physical inspection for granting VAT registration certificates. If an application is correct and complete in all respects, the certificate is granted within one working day, after verification of the scanned documents and copy of challan submitted online by the applicant. The dealer is not summoned for photo or signature verification. In case of any discrepancies, the applicant is notified and further clarification is sought. Details
249

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The Maharashtra Sales Tax Department does not conduct any physical inspection for granting VAT registration certificates. If an application is correct and complete in all respects, the certificate is granted within one working day, after verification of the scanned documents and copy of challan submitted online by the applicant. The dealer is not summoned for photo or signature verification. In case of any discrepancies, the applicant is notified and further clarification is sought. Details
250

Mandate online submission of inspection report within 48 hours to the Department

Approved View File The Maharashtra Sales Tax Department does not conduct any physical inspection for granting VAT registration certificates. If an application is correct and complete in all respects, the certificate is granted within one working day, after verification of the scanned documents and copy of challan submitted online by the applicant. The dealer is not summoned for photo or signature verification. In case of any discrepancies, the applicant is notified and further clarification is sought. Details
251

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File The Maharashtra Sales Tax Department does not conduct any physical inspection for granting VAT registration certificates. If an application is correct and complete in all respects, the certificate is granted within one working day, after verification of the scanned documents and copy of challan submitted online by the applicant. The dealer is not summoned for photo or signature verification. In case of any discrepancies, the applicant is notified and further clarification is sought. Details
252

Design and implement a system for computerized allocation of inspectors

Approved View File The Maharashtra Sales Tax Department does not conduct any physical inspection for granting VAT registration certificates. If an application is correct and complete in all respects, the certificate is granted within one working day, after verification of the scanned documents and copy of challan submitted online by the applicant. The dealer is not summoned for photo or signature verification. In case of any discrepancies, the applicant is notified and further clarification is sought. Details
253

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL Details
255

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Details
257

Design and implement a system for computerized allocation of inspectors

Approved View File MIDC has assigned one inspector for each region, who is allocated to the establishment through a computerized system at the time of application. In this system when an establishment submits an application for Construction Permit, the algorithm allots the respective inspector to it based on the industry location entered by the applicant. Screenshots showing the computerized allocation of inspectors to industries are attached. A clarification letter is also attached. Details
258

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL Details
260

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Details
261

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Click on Application Tracker Insert the application no.: 2015/TREENTRIBAL565/MFD16959 Click on Inspection Report Details
263

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File For the checklist taken by the inspector for inspection of Building Occupancy Certificate, please find the example in the attached document. In that particular case under Nasik Municipal Corporation, the applicant has not submitted carpet area statement and some other documents. Thus this application has been rejected. Details
265

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL Details
267

Design and implement a system for computerized allocation of inspectors

Approved View File MIDC has assigned one inspector for each region, who is allocated to the establishment through a computerized system at the time of application. In this system when an establishment submits an application for Occupancy Certificate, the algorithm allots the respective inspector to it based on the industry location entered by the applicant. The screenshots showing the computerized allocation of inspectors to industries are attached. A clarification letter regarding the same is also attached. Details
268

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site. Details
269

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. Details
270

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
271

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Details
272

Design and implement a system for computerized allocation of inspectors

Approved View File View URL Details
273

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
274

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Directorate of Industrial Safety and Health has published the inspection procedure and checklist on the department web site. A translation is given in the attached document. Details
275

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File View URL Based on the hazard type and number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for your reference. The step-by-step process for the computerized system is described below. Details
276

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
277

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL The Directorate of Industrial Safety and Health has made a provision to allow users to login to the portal and view and download submitted inspection reports on their businesses. Details
278

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under the Factories Act, 1948. Details
279

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
280

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site Details
281

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for reference. Details
282

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
283

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Details
284

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under The Minimum Wages Act, 1948. Details
285

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
286

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site. Details
287

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for reference. Details
288

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for your reference. Details
289

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Details
290

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under The Shops and Establishments Act. Details
291

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
292

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site Details
293

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for your reference. Details
294

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
295

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File The Labour Department as per GR No. 1/2015/28lab10 dated 23.09.2015, conducts joint inspections under 18 Labour Laws including compliance inspections under The Payment of Bonus Act, 1965. Therefore, when a shop/ factory owner downloads their inspection remarks, even though the Service Name says Shops and Establishment Registration, the inspection remarks cover breaches pertaining to all relevant acts including The Payment of Bonus Act, 1965. Details
296

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under The Payment of Bonus Act, 1965. Details
297

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
298

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site. Details
299

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for reference. Details
300

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
301

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File The Labour Department as per GR No.01/2015/28lab10 dated 23.09.2015, conducts joint inspections under 18 Labour Laws including compliance inspections under The Payment of Wages Act, 1936. Therefore, when a shop/ factory owner downloads their inspection remarks, even though the Service Name says Shops and Establishment Registration, the inspection remarks cover breaches pertaining to all relevant acts including The Payment of Wages Act, 1936. Details
302

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under The Payment of Wages Act, 1936. Details
303

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
304

Publish a well-defined inspection procedure and checklist on department’s web site

Approved View File View URL The Commissionarate of Labour has published the inspection procedure and checklist on the department web site Details
305

Design and implement a system for identifying establishments that need to be inspected based on computerized risk assessment

Approved View File The logic on which the establishments are identified for inspections is explained in GR No. 01/2015/28lab10 dated 23.09.2015, where based on the number of workers, the risk category is assigned to industries. The computerized algorithm takes this risk categorization into consideration while selecting industries for inspection. A copy of the GR with the highlighted section is attached for reference. Details
306

Mandate online submission of inspection report within 48 hours to the Department

Approved View File View URL The circular is attached. Further, an English translation for the circular is given for reference. Details
307

Allow users to login to the portal and view and download submitted inspection reports on their businesses

Approved View File View URL Details
308

Design and implement a system for computerized allocation of inspectors

Approved View File View URL After logging in, the inspector can see the system generated list of establishments to be inspected by her/him. The system generates the list by running Auto Scheduler for Randomization based on the predefined risk criteria for industries, and the list is updated periodically as per the frequency of inspection defined under The Payment of Gratuity Act, 1972. Details
309

Mandate that the same inspector will not inspect the same establishment twice consecutively

Approved View File